Case study:Segura's River Bioremediation

From RESTORE
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 37° 58' 43.88" N, 1° 8' 14.00" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Environmental flows and water resources, Hydromorphology, Social benefits
Country Spain
Main contact forename Cristina
Main contact surname Oliveras
Main contact user ID User:coliveras
Contact organisation BIOPULCHER S.L.
Contact organisation web site http://www.biopulcher.com
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The goal of the project was de environmental recovery of Segura River in Murcia, Spain. Over the years, river mud has been accumulated causing problems both in wildlife’s habitat and in surrounding population because of the river flow reduction and the bad odor generated by the river mud, respectively. This project has used bioremediation in order to reduce organic component of the river mud and, therefore to reduce the mud odor. Due to bioremediation, the dredging of the river has not caused odor problems to the population

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Brick application system into the river mud
Once into the river, bacteria released from the brick will start their bioremediation action
Bioremediation bricks where bacterial inocula is retained since its disposal into the river
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district C. H. Segura
River basin Segura

Subcatchment

River name Segura
Area category more than 10000 km²
Area (km2) 1887018,870 km² <br />1,887,000 ha <br />
Maximum altitude category 1000 - 2000 m
Maximum altitude (m) 14131,413 m <br />1.413 km <br />141,300 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover
Waterbody ID



Other case studies in this subcatchment: LIFE Segura Riverlink (Through rivers), Segura's River Bioremediation, Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura)


Site

Name Murcia
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision BIOPULCHER S.L.
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information