Case study:Sågarsfors

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 60° 12' 59.21" N, 24° 14' 42.69" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Ajankohtaista/Julkaisut/julkaisusarja/2011/Sivut/Kunnostuksenvaikutuksetvuollejokisimpukkaan%28Uniocrassus%29.aspx
Themes Fisheries, Habitat and biodiversity
Country Finland
Main contact forename Esa
Main contact surname Lehtinen
Main contact user ID
Contact organisation Centre for Economic Development, Transport and the Environment for Uusimaa
Contact organisation web site http://www.ely-keskus.fi/fi/ELYkeskukset/uudenmaanely/Sivut/default.aspx
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
After restoration. Photo by Esa Lehtinen

Project summary

Edit project overview to modify the project summary.


The old water power mill at Sågarfors in River Siuntionjoki formed a complete obstacle for migrating fish. The dam was removed and a nature-like bypass channel was constructed to improve the conditions for migrating fish.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Before dam removal (Jukka Jormola)
Before dam removal (Jukka Jormola)
Work (Jukka Jormola)
After dam removal (Jukka Jormola)
After dam removal (Jukka Jormola)
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Siuntionjoki River Basin
River basin

Subcatchment

River name Siuntionjoki River
Area category 100 - 1000 km²
Area (km2) 230 km²23,000 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology Organic (i.e. Peat)
Ecoregion Fenno-Scandian Shield
Dominant land cover
Waterbody ID



Site

Name Sågarsfors dam
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Ponded
Reference morphology Artificial channel
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present Yes
Invasive species present No
Species of interest Sea trout (Salmo trutta), freshwater pearl mussel (Margaritifera margaritifera)
Dominant hydrology Artificially regulated
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category 1 - 10 m³/s
Mean annual discharge (m3/s) 2,8",8" is not declared as a valid unit of measurement for this property.
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 500500 m <br />0.5 km <br />50,000 cm <br />
Project started 2006/01/01
Works started 2007/09/02
Works completed
Project completed 2010/12/31
Total cost category 50 - 100 k€
Total cost (k€) 100100 k€ <br />100,000 € <br />
Benefit to cost ratio
Funding sources Centre for Economic Development, Transport and the Environment for Uusimaa, SYKE

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Centre for Economic Development, Transport and the Environment fo Uusimaa
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology Fish
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Building of submerged weirs and pits, Introduction of gravel, Creation of fish passes
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information