Case study:Removal of the Stalapos weir over the river Alagnon
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity, Hydromorphology |
Country | France |
Main contact forename | Guillaume |
Main contact surname | Ponsonnaille |
Main contact user ID | |
Contact organisation | Syndicat intercommunal de gestion de l’Alagnon et de ses affluents (SIGAL) |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Between the municipalities of Murat and Albepierre-Bredons the biological and morphological continuity of river Alagnon was interrupted by a weir for the water supply of a mill. The intake structure was 2,7 m high and 26,5 m wide. A fish pass with limited funcionality hindered the fish migration. On the left bank there is a campsite and meadows on the right.
The restoration of the fish continuity of the Alagnon is one of the main objectives of the River Alagnon 2001-2007 contract, supported by the Syndicat Intercommunal de Gestion de l’ALagnon (SIGAL).
The weir wasn’t used anymore and in 2008 the removal works begun, the riverbed was terraced and bank protections were put in place to prevent bank erosion at the campsite side. The banks were reshaped and revegeteted.
After the works were completed morphological adjustments have already been observed (in the work area, the riverbed is lowered by 1.1 m which seems to be close to equilibrium). At 260 m downstream, at the Stalapos bridge, deposits of materials cause an elevation close to 60 cm. At the railway bridge (360 m upstream of the work) and 800 meters downstream of the weir removed no significant effect was observed.
The first counts of spawning trout show a decrease in the work area; instead, an increase is observed upstream. The immediate impact of the work on trout populations are already canceled by the extremely rapid recolonization upstream.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|