Case study:Removal of the Retuerta dam in the Aravalle river:

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 40° 19' 33.13" N, 5° 35' 6.22" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Hydropower, Hydromorphology
Country Spain
Main contact forename Rosa
Main contact surname Huertas
Main contact user ID
Contact organisation Confederación Hidrográfica del Duero
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The Ministry of Agriculture, Food and Environment launched in 2007 the National Strategy for River Restoration to, in keeping with the Water Framework Directive, achieve a good ecological status of rivers. One of the main lines of action is the demolition of transversal obstacles that are in a state of abandonment and have a great impact on the longitudinal connectivity of rivers. In the Duero River basin, more than 80 obstacles have been demolished in recent years. During the months of February and March of 2013, the works to demolish the Retuerta Dam, on the Aravalle river, located in the municipality of Umbrías (province of Ávila) took place. The dam was approximately 14 metres in height and 55 metres in length, making it the highest dam demolished to date. The removal of this dam was contemplated as a compensation measure in an Environmental Impact Statement, with the purpose of recovering the longitudinal connectivity of the Aravalle River in this stretch, which constitutes a rich fluvial ecosystem, torrential in nature, and with abundant ichthyofauna. In fact, the Aravalle River is one of the most relevant watercourses for sustaining fish populations within the Tormes River system. There has also been work related to monitoring the mobilization of sediments and the recovery of the fluvial ecosystem, as well as public information and participation seminars.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Dam removal
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.chduero.es/Inicio/Publicaciones/DVDsyAudiovisuales/tabid/586/Default.aspx Project video (English and Spanish versions available)

Supplementary Information

Edit Supplementary Information