Case study:Friends of Afon Llwyd (FOAL)

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 42' 51.49" N, 3° 3' 17.17" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.wyeuskfoundation.org/projects/foal.php
Themes Environmental flows and water resources, Fisheries, Habitat and biodiversity, Monitoring
Country Wales
Main contact forename Stephen
Main contact surname Marsh-Smith
Main contact user ID
Contact organisation Wye & Usk Foundation
Contact organisation web site http://www.wyeuskfoundation.org/
Partner organisations Torfaen County Borough Council, Cwmbran Angling Association, Pontypool Angling Club
Parent multi-site project
This is a parent project
encompassing the following
projects
No
The area the FOAL Project worked on

Project summary

Edit project overview to modify the project summary.


In March 2010 the Foundation started a 21 month EAW Wild Fishing Wales funded project on the Afon Llwyd. In partnership with Torfaen County Borough Council, Cwmbran Angling Association and Pontypool Angling Club, the project was designed to improve salmon, sea trout and brown trout stocks in this lower Usk tributary that joins the main river just upstream of Newport. Once one of the most polluted rivers in the UK, Afon Llwyd was "cleaned up" in the '80s and though it receives the occasional mine water discharge, it is now able to support salmonids. Recently, Environment Agency Wales completed a fish pass to allow fish to ascend the first weir upstream of the tide at Pontymoel.

The project has involved litter removal, invasive weed eradication and other habitat improvements such as coppicing and erosion-preventing revetments. The EAW's Wild Fishing Wales program's objective is, as the name suggests, to increase fishing opportunities. Within FOAL, riverside paths have been made safe and assistance provided for partially disabled anglers. Some the Llwyd's fishing has also been included in the Foundation's Wye & Usk Passport.

One of the first actions under the FOAL project was to lower a weir that blocks the path of migrating fish further upstream at Tynantddu, Pontypool. This was followed by work to the weir upstream at Cwmafon. In addition, we have increased the salmonid spawning habitat of the river, little of which existed upstream of Pontypool, by constructing 'V' weirs to trap gravel and create suitable areas.


Progress:

2010


March

Meeting of partners. Consents applied for weir removal at Tynantddu.


April

First litter clearance. Upper catchment survey.


May

Weir removed at Tynantddu.


August

Weir at Cwmafon removed.


September

Japanese Knotweed spraying.


October

Revetment to repair erosion at Llanyrafon.


December

Coppicing trees below Cwmbran.


2011

The coppicing for the winter period concluded, it was time to reflect on the successes of 2010 and set the stage for work in the second phase of the project during 2011.

March: In partnership with the TCBC and EAW it was deemed necessary to mitigate for the loss of Torfaen’s only known Sand Martin nesting site at Llanyrafon. The site was lost when the eroded riverbank was restored to prevent further loss of playing fields. This was unknown territory for everyone concerned with the project and definitely a first for the area. Following advice and with plans from the Sand Martin Trust, the Foundation had two artificial nest boxes manufactured by a local fabricator. Just before the migratory birds were due to return to Torfaen, the boxes were set in place on the revetment site where the old natural nest site used to be. Within two weeks the Sand Martins had returned and immediately took up residence in them. In fact, there seemed to be more pairs in residence than in previous years at the old site. The nest boxes were a huge success for the project and proved that with care and planning, environmental risks can be mitigated when a project such as the riverbank revetment takes place.

April: Volunteers sprayed Giant Hogweed at certain locations in Pontypool and Cwmbran. No further sightings reported. Sites surveyed with Cwmbran Anglers for best places to construct disabled fishing access ramps and platforms.

May: Survey Afon Lwyd with EA staff to decide on sites for gravel traps. Local farm contractor constructed four log gravel traps in the Afon Lwyd below Cwmavon.

June: Litter pick at Llanyrafon with KWT and volunteers. 1 skip full of rubbish removed. Disabled fishing access platform and ramp under construction. Site sought for erection of the WFW plaque.

July: Afon Lwyd litter pick in the boating lake area. 30+ bags rubbish collected along with shopping trolleys etc. Disabled angling platform and ramp completed and checked. Mount for WFW slate plaque manufactured by local woodworker and woodcarver. WFW plaque fixed adjacent to the river at Northfields car park, Llanyrafon. Local volunteers involved in the ground preparation and fixing. Disabled angler signs erected near platform and access ramps. The WFW plaque unveiling at Northfields car park was very well attended by local dignitaries and project partners.

August: Surveys undertaken with local authority staff to determine sites for forthcoming Japanese Knotweed spraying and coppicing season. Plans put in place to construct an artificial otter holt in the grounds of Pontypool Park. This project would be undertaken by local volunteers. Litter pick at Pontypool Park with KWT and volunteers. 2 skips filled, one with rubbish and the other with scrap metal. 12 volunteers gave up their day to help with this clean up.

September: An artificial otter holt constructed from logs was constructed on the riverbank within Pontypool Park. 16 volunteers, including 8 local scouts, participated in this event. Japanese Knotweed spraying on both banks of the Afon Lwyd through Cwmbran Park with WUF staff and volunteers. Electrofishing Afon Lwyd with EA staff took place with varying results. It was encouraging to find salmon fry in the river upstream of where the Tynantddu weir was altered.

October: The Japanese Knotweed spraying programme continued and showing excellent results. Coppicing of mostly alder and sycamore started at upper end of Cwmbran Park by a WUF habitat team 2 gravel traps constructed in the main river at Abersychan. November: Coppicing and spraying programmes completed early in the month. Gravel traps surveyed with EA for amount of clean gravels required to complete the project.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2010/03/01
Works started 2012/01/01
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Bank erosion, Invasive species, Litter, Loss of gravel
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Removal of invasive plants, Gravel traps, Bank improvement, Cut back of trees
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions Litter picking
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information