Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Urban
Country Spain
Main contact forename Naturalea S.L.
Main contact surname Naturalea S.L.
Main contact user ID
Contact organisation Naturalea S.L.
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The section corresponds to restore the stream of Ruby as it passes through the town from which it takes its name. In this section, the stream is strongly modified by the concrete walls built in the margins and along the breakwater that covers all the main channel and high water. Using previously vegetated materials and introducing local plant species, the objectives seek to: minimize the impact of the various works carried out within the stream, improve the quality of riparian ecosystems conjugating with the need to maintain hydraulic capacity and restore the banks the level that allows cleaning of exotic species and the planting of willow and herbaceous riparian own. The project has a total budget of 15.960,47 € and is financed by the Municipality of Rubí.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Map of the restoration area
Aerial view of the restoration area
Photos of the area before works
Photos of the area before works
Photos of the area before works
Photos of the area after works
Photos of the area after works
Photos of the area after works
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Pirineo Oriental
River basin Llobregat

Subcatchment

River name Riera de Rubí
Area category
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m) 120 m0.12 km <br />12,000 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover Urban
Waterbody ID



Site

Name Riera de Rubí a su paso por el núcleo de Rubí
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Embanked
Reference morphology Embanked
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use Urban
Average bankfull channel width category 10 - 50 m
Average bankfull channel width (m) 4242 m <br />0.042 km <br />4,200 cm <br />
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 745 m0.745 km <br />74,500 cm <br />
Project started 2007/12/01
Works started
Works completed 2007/12/01
Project completed
Total cost category 10 - 50 k€
Total cost (k€) 15 k€15,000 € <br />
Benefit to cost ratio
Funding sources Municipality of Rubí

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision Naturalea, S.L.
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Structural measures
Bank/bed modifications New bioengineering elements in order to stabilize slope banks, Revetmens with local species
Floodplain / River corridor Restoring riparian vegetation
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information