Project overview
Status | Complete |
---|---|
Project web site | http://www.chguadalquivir.es/inicio |
Themes | Environmental flows and water resources, Land use management - forestry, Spatial planning |
Country | Spain |
Main contact forename | Maria Jesus |
Main contact surname | Castañeda |
Main contact user ID | |
Contact organisation | Guadalquivir Hydrographic Confederation. Ministry for Ecological Transition. |
Contact organisation web site | http://www.chguadalquivir.es/inicio |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The project aimed to improve the natural value of the Riopudio stream and its surroundings, in order to constitute an environmental reference in articulating the region of Aljarafe, promoting its public use by citizens of the region.
The preliminary work consisted in the elimination of the shrub vegetation in order to allow the execution the new profiles and avoid, as far as possible, the subsequent invasion of some very colonizing species.
The design of the conditioning of the riverbed has been adapted to the natural conformation of the stream with slopes to avoid erosion and facilitate its subsequent revegetation. In addition, breakwater and dyke structures were installed in order to guarantee the structural stability of the riverbed, helping its stabilisation and thus reducing erosion.
When it comes to restoring the vegetation cover of the Riopudio stream, previous action has been taken on the existing one, eliminating invasive species and weeds by clearing them, while preserving and improving the aerial structure of those specimens and copses that are within the areas to be revegetated and which, due to their ecological value, shall be to maintained.
The public footpaths have been built along the two margins, creating accesible pedestrians walkways, and allowing the development of educational activities. They will be accesible on foot or by bicycle and, exceptionally, by authorised motorised vehicles for the maintenance of the area. Thirteen wooden footbridges have also been installed. Appart from this, five recreation areas for rest and lesure have been built.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|