Case study:Creation and restoration of a riparian zone

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 42° 22' 39.99" N, 1° 28' 7.64" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Habitat and biodiversity, Social benefits, Water quality
Country Spain
Main contact forename Fernando
Main contact surname Mendoza
Main contact user ID
Contact organisation Gestión Ambiental Viveros y Repoblaciones de Navarra, S.A.
Contact organisation web site
Partner organisations
Parent multi-site project

Case_study:LIFE - GERVE

This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The Soto of Campollano is downstream Carcastillo town. The work area was located on the left Aragon River bank, where the little tributary Abejar ravine flows into the Aragon River. The tributary of Aragon is surrounded in its mouth by a river forest of 32.6 has called Soto de Campollano represented by the habitat 92AO in a good conservation status. In the riversides there are areas of grasslands. The main objective of this project is to increase the quality of habitat in Community Interest Areas, with special attention to European mink (Mustela lutreola). There are other secondary objectives: Creating new habitats for otter (Lutra lutra) and turtle (Emys orbicularis); quality improvement of habitats 92A0 (willow and black poplar plantation) and 3150. The project includes the creation of some new habitats that affect animals and plants. New bio-engineering techniques are used to develop and help these riparian communities. The project was presented by the “Environmental Management for Reintroduction and Repopulation in Navarre” in cooperation with the Government of Navarre’s Environment, Land and Housing Department. It was part of a LIFE project.

Construction of three small ponds connected through small meandering channels.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Map and aerial photograph of the area of action
State of the area before works
Artificial pond created in the area
Artificial pond created in the area
Detail of vegetation growth along the banks of the lagoon
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Ebro
River basin Aragón

Subcatchment

River name Aragón
Area category 1000 - 10000 km²
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 350 m0.35 km <br />35,000 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover Extensive agriculture
Waterbody ID



Other case studies in this subcatchment: Restoration of riparian zone in Aragon River


Site

Name Soto de Campollano
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Sinuous, Single channel
Reference morphology Sinuous, Single channel
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations Habitat 92AO
Protected species present
Invasive species present
Species of interest
Dominant hydrology Quick run-off, Artificially regulated
Dominant substrate
River corridor land use Plantation forestry, Intensive agriculture, Wetland
Average bankfull channel width category 10 - 50 m
Average bankfull channel width (m)
Average bankfull channel depth category 2 - 5 m
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 211 m0.211 km <br />21,100 cm <br />
Project started
Works started 2005/08/01
Works completed 2006/02/01
Project completed
Total cost category 50 - 100 k€
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Continuity for organisms
Biology
Physico-chemical
Other reasons for the project High quality habitat for European mink (Mustela lutreola), New habitats for otter (Lutra lutra) and turtle (Emys orbicularis)


Measures

Structural measures
Bank/bed modifications Pond creation
Floodplain / River corridor River forest has been restored through the plantation of species typical from habitat 92AO
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information