Case study:Restoration of the Charentonne in the Serquigny public garden

From RESTORE
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 49° 6' 32.43" N, 0° 42' 57.09" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Monitoring, Social benefits, Spatial planning
Country France
Main contact forename Franck
Main contact surname Perraudin
Main contact user ID
Contact organisation Mairie de Serquigny
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


In Serquigny, the Charentonne is an urban river split into several strongly altered channels, due to hydropower production. The arm where the restoration works were carried out is fed by a weir upstream and underwent several dredging operations that left it overwidened, with a very low slope, morphologically homegeneous and affected by significant eutrophication. It is now located in a public garden of the town and within the Natura 2000 site "Risle, Guiel, Charentonne". The weir was restored in order to ensure a minimum flow of 300 L/s and a fish pass was installed. Accumulated fine sediments were extracted and used to create vegetated terraces, protected with bioengineerng techniques; a narrower, low flow channel was recreated, with higher slope.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Seine-Normandie
River basin

Subcatchment

River name Charentonne
Area category 100 - 1000 km²
Area (km2) 513 km²51,300 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion
Dominant land cover
Waterbody ID



Site

Name Serquigny public garden
WFD water body codes FRH61-0400
WFD (national) typology HER1-9 / HER2-57
WFD water body name
Pre-project morphology High width:depth
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation EU - Special Area of Conservation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology Artificially regulated
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s) 0.5290.529 m³/s <br />529 l/s <br />
Average channel gradient category
Average channel gradient 0.002619
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 230 m0.23 km <br />23,000 cm <br />
Project started 2001/01/01
Works started 2005/09/01
Works completed 2006/03/01
Project completed
Total cost category 100 - 500 k€
Total cost (k€)
Benefit to cost ratio
Funding sources General Council of the Eure, Agency of Seine-Normandy Water

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design 100 - 500 k€ General council of Eure and Lafosse &Fils SARL Bertrand Morandi
Stakeholder engagement and communication Agency of Seine-Normandy Water Franck Perraudin
Works and works supervision
Post-project management and maintenance
Monitoring 1 - 10 k€ 6892 k€6,892,000 € <br />



Reasons for river restoration

Mitigation of a pressure Riparian development
Hydromorphology Channel pattern/planform, Flow velocities, Structure & condition of riparian zones
Biology Invertebrates: Abundance
Physico-chemical
Other reasons for the project Landscape enhancement, Bank erosion


Measures

Structural measures
Bank/bed modifications Coir rolls, Bank reprofiling
Floodplain / River corridor Riparian planting, Protect/restore riparian zone
Planform / Channel pattern Re-meandering
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Invertebrates: Taxonomic composition Yes Yes Yes

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
[[]] Yes

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos