Project overview

Edit project overview
Status In progress
Project web site
Themes Environmental flows and water resources, Habitat and biodiversity, Monitoring, Social benefits, Spatial planning, Water quality, Urban
Country Austria
Main contact forename Jörg
Main contact surname Raderbauer
Main contact user ID User:9984
Contact organisation freiland Environmental Consulting Civil Engineers Ltd.
Contact organisation web site http://www.freiland.at
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


In the light of a dynamically developing city the river Mur is a significant leisure and recovery corridor in the urban area of Graz. This importance will even increase over the next decades. Under the motto „habitat Mur - sustainable use, cautious development, intense experience and attractive design” freiland Environmental Consulting Civil Engineers Ltd. is dealing with this urban river habitat for almost 10 years now.

On basis of the concept "habitat Mur" (LebMur) a planning process has been initiated in 2004, which is constantly optimized since then. Under this concept opportunities for development and measures have been identified that contribute to the protection, the enhancement and the long-term ecological management of the habitat Mur. In the subsequent preparation of the Master plans Mur - Graz south and Graz center the concept was revived, adapted to the new environment (power plant project) and developed accordingly. The detailed design and the continuous site monitoring secured the quality of the implementation of the first recreational areas resulting from this process: the promenade Graz Süd including harbour and the "Auwiesen".

The current focus of the habitat development lies in the establishment of the "regional park alluvial area on the river Mur". The integrated development process aims at reducing landuse conflicts in metropolitan areas. The goal is to accomplish new qualities for this area which is characterized by high pressure on the environment. Subsequently an attractive and usable urban landscape will be developed, by taking into consideration the important role of the river.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Urban River Landscape Graz - Recreation and chilling areas at the waterfront (Capital of Styria) 2004 – ongoing ©freiland
Urban River Landscape Graz - Strolling water promenade in Graz (Capital of Styria) 2004 – ongoing ©Michael Steinwender
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 10001,000 m <br />1 km <br />100,000 cm <br />
Project started 2004/01/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project Reducing landuse conflicts


Measures

Structural measures
Bank/bed modifications Structuring of shoreline, Construction gravel bays
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Planning workshop
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information