Project overview

Edit project overview
Status Complete
Project web site http://www.dramurci.eu/page/
Themes Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Hydromorphology
Country Austria, Slovenia
Main contact forename Jörg
Main contact surname Raderbauer
Main contact user ID User:9984
Contact organisation freiland Environmental Consulting Civil Engineers Ltd.
Contact organisation web site http://www.freiland.at
Partner organisations Office of the Styrian Government - Department 14 Watermanagement, resources and sustainability
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The project aims at the integration of the water management activities in the area of the largest rivers (Drava and Mur), which are shared by two EU states (Austria and Slovenia), according to two EU Directives: Water Framework Directive (WFD Water Framework Directive) and Flood Directive (Directive Flood FD). The project established common standards for the handling of floods and the management of sediments. This was achieved through intensive cooperation and exchange of experiences.

The DRA-MUR-CI project activities covered coherent cross-border development and support measures for the protection of humans and the environment against natural disasters and for improving the living environment of people, flora and fauna. Six work-packages enforced the establishment of information-based technology for protection measures against flooding, the exchange of experience at professional level and proved the concept in pilot projects.

The total value of this four year project was 3.5 million €. The project was co-financed by the European Regional Development Fund of the European Union.

The project focused on in-depth research and development in the field of water management and cross-border cooperation, enforcing the understanding of flooding, flood risk and the control of sediments. Based on the analysis of scientific data the system of warning and informing citizens, civil protection shall be improved and bilateral warning and action plans upgraded. The regulation of rivers and flood protection measures aimed at re-evaluating the nature and the living environment of both rivers and the facilitation of integrated action in the form of pilot projects on the rivers Drava and Mur.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ETZ-Project “DraMurCi” 2009-2013 - Overview project
ETZ-Project “DraMurCi” 2009-2013 - Murturm
ETZ-Project “DraMurCi” 2009-2013 - austrian-slovenian cooperation
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2009/01/01
Works started
Works completed
Project completed 2013/12/31
Total cost category 1000 - 5000 k€
Total cost (k€) 3500
3,500 k€
3,500,000 €
Benefit to cost ratio
Funding sources European Regional Development Fund

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information