Case study:Conservation of alluvial

From RESTORE
Revision as of 07:34, 25 April 2013 by Marinela (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 46° 1' 23.16" N, 18° 41' 22.16" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country Hungary
Main contact forename Viktoria
Main contact surname Siposs
Main contact user ID
Contact organisation WWF Hungary, Danube Drava National Park Directorate
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Danube
River basin Danube

Subcatchment

River name Sava River
Area category more than 10000 km²
Area (km2)
Maximum altitude category 500 - 1000 m
Maximum altitude (m) 833833 m <br />0.833 km <br />83,300 cm <br />
Dominant geology Calcareous
Ecoregion Dinaric Western Balkan, Alps
Dominant land cover
Waterbody ID



Other case studies in this subcatchment: Hainburg River Restoration, INTERREG MED WETNET - Memoradum on Participation in Wetland Conservation in Ljubljansko Barje Nature Park, Marsh protection in Egyek–Pusztakócs, National Park Danube-Auen, Regelsbrunner Aue, Renaturation of Stržen's riverbed on intermittent Cerknica Lake, The Bulgarian Wetlands Restoration and Pollution Reduction Project, Witzelsdorf Pilot Project


Site

Edit site
Name Szabadság-sziget (Liberty Island)
WFD water body codes AEP445
WFD (national) typology
WFD water body name
Pre-project morphology Artifical oxbow completely cut-off from the main river; Silted up significantly
Reference morphology Sidearm
Desired post project morphology
Heavily modified water body No
National/international site designation EU - Special Protected Area
Local/regional site designations Natura 2000; National Park
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Permanent lentic
Dominant substrate Sand, Gravel
River corridor land use Intensive agriculture, Woodland, Urban
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category 5 - 10 m
Average bankfull channel depth (m)
Mean discharge category more than 1000 m³/s
Mean annual discharge (m3/s) 28232,823 m³/s <br />2,823,000 l/s <br />
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m) 30003,000 m <br />3 km <br />300,000 cm <br />
Project started
Works started
Works completed
Project completed
Total cost category 1000 - 5000 k€
Total cost (k€) 17951,795 k€ <br />1,795,000 € <br />
Benefit to cost ratio
Funding sources LIFE+ (LIFE07 NAT/H/000320) (http://ec.europa.eu/environment/life/project/Projects/index.cfm?fuseaction=home.createPage&s_ref=LIFE07%20NAT/H/000320)

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design WWF Hungary, Danube-Drava National Park Directorate, Municipality of Mohács town Viktoria Siposs
Stakeholder engagement and communication Lower-Danube-Valley Water Management Directorate, WWF Hungary
Works and works supervision 1000 - 5000 k€ 10751,075 k€ <br />1,075,000 € <br /> WWF Hungary, Cargill Hungary, Transdanubian Regional Waterworks Public Company (DRV Zrt.)
Post-project management and maintenance Danube Drava National Park Directorate Sandor Kövesi
Monitoring Danube Drava National Park Directorate



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology Quantity & dynamics of flow, Substrate conditions
Biology Fish: Species composition
Physico-chemical Nutrient concentrations
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications Dredging, Removal of rock-fill weir, Relocation of the drinking water pipes
Floodplain / River corridor Removal of alien and invasive tree species
Planform / Channel pattern
Other
Non-structural measures
Management interventions Protection of the island, Ensuring biodiversity
Social measures (incl. engagement) Recreation, Improvement of drinking water quality, Land purchase
Other Information provision, Consultation, Participation in works


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Quantity & dynamics of flow Yes Yes No Yes No Awaiting results

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish: Species composition No No Yes No No Awaiting results
Invertebrates: Taxonomic composition No No Yes No No Awaiting results

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information