Case study:Habitat and water flow restoration on River Rábca
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: 47° 26' 2.25" N, 17° 0' 55.40" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.edukovizig.hu/projektjeink |
Themes | Flood risk management, Habitat and biodiversity, Hydromorphology |
Country | Hungary |
Main contact forename | István |
Main contact surname | Nádor |
Main contact user ID | |
Contact organisation | North-Transdanubian Water Management Directorate titkarsag@edukovizig.hu |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
Edit project overview to modify the project summary.
The aims of the two-phase revitalization were to enhance the water supply of the river under Répcelak, to fit hydraulic structures into the landscape, to restore natural hydrologic conditions, to increase the area of fish habitats and spawning grounds, to establish continuous shading and to ensure the stability of the riverbed on a long term basis by planting of native tree species along the river bank and by strengthening the bank with natural materials.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube River Basin District |
---|---|
River basin | Danube |
Subcatchment
River name | River Rábca (Rabnitz) |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | |
Maximum altitude category | 100 - 200 m |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Alps |
Dominant land cover | Intensive agriculture, Plantation forestry, Woodland |
Waterbody ID |
Site
Name | Rábca |
---|---|
WFD water body codes | AEP904 |
WFD (national) typology | 13 |
WFD water body name | |
Pre-project morphology | Single channel, Straight |
Reference morphology | Single channel, Sinuous, Pool-riffle |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | EU - Special Area of Conservation |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | Artificially regulated, Permanent lotic |
Dominant substrate | Gravel |
River corridor land use | Intensive agriculture (arable), Woodland, Plantation forestry |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 2 - 5 m |
Average bankfull channel depth (m) | |
Mean discharge category | 1 - 10 m³/s |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 18000 m18 km <br />1,800,000 cm <br /> |
---|---|
Project started | 2010/10/01 |
Works started | 2011/09/01 |
Works completed | 2012/05/01 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 241 k€241,000 € <br /> |
Benefit to cost ratio | |
Funding sources | EU Environment and Energy Operational Program |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | 100 - 500 k€ | 241 k€241,000 € <br /> | SOLVEX LTD. http://www.solvex.hu | Tibor | Kránitz |
Stakeholder engagement and communication | Hungarian Ornithological and Nature Conservation Society (MME) | ||||
Works and works supervision | Oktaéder Építőipari, Kereskedelmi és Szolgáltató LTD | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Removal of reed, Removal of weirs, Removal of small bars |
Floodplain / River corridor | Riparian tree planting |
Planform / Channel pattern | |
Other | Removal of fallen trees |
Non-structural measures
| |
Management interventions | Ensuring biodiversity |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|