Case study:Toce River: conservation of riparian habitats for breeding and migratory birds - LIFE02 NAT/IT/008572
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Italy |
Main contact forename | Barbara |
Main contact surname | Lomazzi |
Main contact user ID | |
Contact organisation | Verbania County |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The river Toce in the Alps is the next largest tributary of Lake Maggiore after the river Ticino. It is a very important site for nesting birds and especially migrating birds including priority species, such as the corncrake (Crex crex). The Toce fulfils a vital role as an ecological corridor across the Alps during bird migration.
The project aimed to help the conservation, rehabilitation and extension of the river and riverbank habitats along a stretch of the river Toce downstream Domodossola.
The project achieved some relevant results such as the creation of an area with different water levels down to a maximum depth of 1 m, thus favouring amphibians and birds in the locality of Prata (Municipality of Vogogna); the reduction of the presence of invasive exotic trees and shrubs in termophilous shrub habitats; the maintenance of suitable habitat for nesting birds in the lowland hay meadows through specific management intervention consisting in mowing; the creation of new alluvial forests.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Distretto idrografico del fiume PO |
---|---|
River basin | Bacino del Toce |
Subcatchment
River name | Toce |
---|---|
Area category | 10 - 100 km² |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Italy and Corsica |
Dominant land cover | Urban |
Waterbody ID |
Site
Name | IT1140006 “Greto del torrente Toce tra Domodossola e
Villadossola” |
---|---|
WFD water body codes | 01SS4N829PI |
WFD (national) typology | PE01ss4n |
WFD water body name | |
Pre-project morphology | Braided |
Reference morphology | Braided |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | EU - Special Area of Conservation |
Local/regional site designations | SIC e ZPS “Greto del torrente Toce tra Domodossola e Villadossola”, IT1140006 |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Gravel, Mixture with sand and lime |
River corridor land use | Urban |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | 4.6 |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
[[]] |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|