Case study:Salzano wetland and Marzenego river restoration project
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Land use management - forestry, Monitoring, Social benefits, Water quality |
Country | Italy |
Main contact forename | Paolo |
Main contact surname | Cornelio |
Main contact user ID | |
Contact organisation | Consorzio di Bonifica Acque Risorgive |
Contact organisation web site | http://www.acquerisorgive.it/ |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
In order to reduce eutrophication problems that severely impair the quality of the Venice lagoon waters, the local government
(the Veneto Region Authority), more than a decade ago,established a series of targets for the the reduction of nutrients that
flow into the lagoon. As a detailed example, The “Salzano wetland” restoration was completed by the consortium which was, until the mid-1980s, subject to mining of clay. Since this period this 60 ha site has gradually been restored. Today this site is characterized by a mosaic of habitats of different spatial extent. The main actions of the project were:
a)to create a system of new banks around a dry and with low ecological value portion (20 ha wide) of the extent wetland, and later to connect this area with the adjacent watercourse using gates to manage flows; b)reshaping the net of canals, ponds and pools inside this area to find the optimal residual time of the water to assure an efficient nutrient reduction; c)re-establish rare and endangered aquatic vegetation types (Carex elata, Cladium mariscus, Allium angulosum, Cirsium canum, Senecio paludosus, Typha laxmannii, Iris pseudacorus and Nuphar luteum) and monitor their development; d)create a new net of small channels to connect this restored wetland to the other portions; e)create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Alpi Orientali |
---|---|
River basin | Bacino scolante della Laguna di Venezia |
Subcatchment
River name | Bacino scolante della Laguna di Venezia |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | 2,0382,038 km² <br />203,800 ha <br /> |
Maximum altitude category | 100 - 200 m |
Maximum altitude (m) | |
Dominant geology | |
Ecoregion | Italy and Corsica |
Dominant land cover | Intensive agriculture (arable) |
Waterbody ID |
Other case studies in this subcatchment: Pagana canal restoration project, Rio San Martino and Piovega di Scandolara restoration project, Rio Sant'Ambrogio restoration project, Scolo Desolino restoration project, Zero river restoration project
Site
Name | Salzano wetland and Marzenego river |
---|---|
WFD water body codes | 666_10 |
WFD (national) typology | |
WFD water body name | MARZENEGO - OSELLINO (DIRAM.) |
Pre-project morphology | Artificial channel |
Reference morphology | Low gradient passively meandering |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | Italy - Siti di Importanza Comunitaria |
Local/regional site designations | SIC IT3250008 |
Protected species present | Yes |
Invasive species present | Yes |
Species of interest | |
Dominant hydrology | Artificially regulated |
Dominant substrate | |
River corridor land use | Intensive agriculture (arable) |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | 1 - 10 m³/s |
Mean annual discharge (m3/s) | |
Average channel gradient category | 0.001 - 0.01 |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2007 |
Works started | |
Works completed | |
Project completed | 2009/10/01 |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 2,7142,714 k€ <br />2,714,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Veneto Region - “Piano per la prevenzione dell’inquinamento ed il risanamento delle acque del bacino idrografico immediatamente sversante in Laguna – Piano Direttore 2000” |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Reshaping the net of canals, ponds and pools inside the wetland |
Floodplain / River corridor | Hydraulic connection between the river and an outflow wetland |
Planform / Channel pattern | |
Other | re-establish rare and endangered aquatic vegetation types |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | create a net of path and observation structures accessible to the public for recreation, educational and technical-scientific purposes |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Nutrient concentrations | No | Yes | No | Yes | No |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references