Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Fisheries, Habitat and biodiversity, Hydropower |
Country | Finland |
Main contact forename | Anne |
Main contact surname | Laine |
Main contact user ID | |
Contact organisation | Centre for Economic Development, Transport and the Environment for North Ostrobothnia |
Contact organisation web site | http://www.oulunenergia.fi/ymparistovastuu/kalatie |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Construction of the fishway in the Merikoski brook was the first step restoring the Oulujoki river for migrating fish. Merikoski water power plant was the lowest obstacle for fish migration before the fishway was constructed in 2003. The constructed fishway now enables salmon and other migtating fish to rise up 40 km to the lower reaches of the Oulujoki river.
Migratory fishes are planted into the Merikoski every year. Also the fish migration, the amount and types of the fishes are monitored with the help of underwater videocamera and fish counter.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | - |
---|---|
River basin | Oulujoki River basin |
Subcatchment
River name | Oulujoki River |
---|---|
Area category | more than 10000 km² |
Area (km2) | 2284122,841 km² <br />2,284,100 ha <br /> |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | |
Ecoregion | Fenno-Scandian Shield |
Dominant land cover | |
Waterbody ID |
Site
Name | Merikoski torrent water power plant |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Artificial channel |
Reference morphology | Artificial channel, Fishway |
Desired post project morphology | |
Heavily modified water body | Yes |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | Brown trout (Salmo trutta), Atlantic salmon (Salmo salar) |
Dominant hydrology | Artificially regulated |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information