Case study:Restoration project in Turia River
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | C.H.Júcar |
Main contact surname | C.H.Júcar |
Main contact user ID | |
Contact organisation | C.H.Júcar |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
As part of the National River Restoration (ENRR), it has been selected 10 river reaches of the Confederation Júcar (CHJ), in which restoration projects will be developed. One of these sections corresponds to the Turia River in a stretch of 15.6 km upstream of the Turia Natural Park. The purpose of the restoration of that reach is the recovery of good ecological status, required for the WFD by 2015. Thus, the actions proposed are targets in the short and long term, all framed in ENRR and the WFD.
The main project objectives are, in short term, conditioning of DPH to improve the functioning natural hydraulic channel; increase river mobility space; conservation of riparian ecosystems; maintenance and improvement of current vegetation conditions; control of exotic vegetation; increased diversity of plant cover; improving the mobility of fish fauna; landscaping adjustment and environmental restoration of degraded areas; social use.
Long term: Improve the river dynamics; enhancement of riparian forest development; improving the aquatic environment and associated land to allow regeneration and diversification of the fauna; promoting social use of the river more attractive and environmentally; promote integration of use policies and land management with the use and management of rivers, with sustainability criteria.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Júcar |
---|---|
River basin | Júcar |
Subcatchment
River name | Turia |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Site
Name | Restauración del río Turia en los municipios de Gestalgar, Bugarra y Pedralba (Valencia) |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Clay, Cobble |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 15600 m15.6 km <br />1,560,000 cm <br /> |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | MARM |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | C.H.Júcar | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Revetmens with local species, Weirs removal |
Floodplain / River corridor | Removal of exotic plants, Elimination of structural elements concreted |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | Conditioning access for people |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |