Case study:Environmental regeneration project in Magro river bed
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | C.H.Júcar |
Main contact surname | C.H.Júcar |
Main contact user ID | |
Contact organisation | C.H.Júcar |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
This is an action that will address the full decontamination of the channel and to solve problems of ecosystem degradation and pollution caused by surface water and groundwater so that the natural action is capable of, in the future, retrieve and maintaining good ecological conditions of the middle and upper reach. The project is based on performances in the Magro River and in its tributaries.
The main objective of this project is to improve ecological quality of Magro River and its tributaries, ensuring its future maintenance. The project has a total budget of 3.879.909 € and is financed by the Ministry of Environment.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Júcar |
---|---|
River basin | Júcar |
Subcatchment
River name | Magro |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Site
Name | Proyecto de restauración del río Magro desde Caudete de Las Fuentes hasta el Embalse de Forata |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 0.910.91 m³/s <br />910 l/s <br /> |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 72000 m72 km <br />7,200,000 cm <br /> |
---|---|
Project started | 2009/11/01 |
Works started | |
Works completed | |
Project completed | |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 3879 k€3,879,000 € <br /> |
Benefit to cost ratio | |
Funding sources | MARM |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Vielca Ingenieros S.A. | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | Pollution |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | Nutrient concentrations |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | Selective removal of organic muds and sludge contaminated with toxic |
Non-structural measures
| |
Management interventions | Cleaning channels |
Social measures (incl. engagement) | Conditioning roads, Conditioning access for people |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|