Case study:Fluvial river restoration of Tordera in Tordera
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | ACA |
Main contact surname | ACA |
Main contact user ID | |
Contact organisation | ACA |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
Tordera River as it passes through the town of Tordera has lost the dynamism that was a few years ago, leaving behind an oxbow on the left.
The main objectives are improve lateral and longitudinal connectivity, both hydrological and biological, improving the diversity of habitats in the river system, restore riparian plant communities and minimize flood risk .
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Pirineo Oriental |
---|---|
River basin | Tordera |
Subcatchment
River name | Tordera |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | Less than 100 m |
Maximum altitude (m) | 25 m0.025 km <br />2,500 cm <br /> |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | Urban |
Waterbody ID |
Other case studies in this subcatchment: Fluvial river restoration of Tordera in Sant Celoni, Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water
Site
Name | Río Tordera en Tordera |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Sinuous |
Reference morphology | Sinuous |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | Less than 0.5 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 5.015.01 m³/s <br />5,010 l/s <br /> |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 75 m0.075 km <br />7,500 cm <br /> |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | ACA |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Channel pattern/planform, Width & depth variation |
Biology | |
Physico-chemical | |
Other reasons for the project | Landscape enhancement |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | New habitats construction |
Planform / Channel pattern | Re-instatement of old course, Artificial wall removal |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|