Case study:Fluvial river restoration of Tordera in Sant Celoni

From RESTORE
Revision as of 08:59, 18 February 2013 by CIREF AI (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 41° 41' 3.56" N, 2° 29' 39.88" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Spain
Main contact forename Joan
Main contact surname Feliu
Main contact user ID
Contact organisation Acciónatura
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Tordera River passing through Sant Celoni, boxed in between the AP-7, to its right bank, and industrial parks and estates, to his left side, presents a high state of degradation. These interventions in the territory have altered the natural course of the river and caused the loss of habitats within the area. In these latter interventions we must add the intensive use floodplain for agriculture, livestock, crops poplar and aggregate extraction. The main objectives of this project are: To improve the structure and composition of the vegetation; landscape integration of rip-raps; Creation of refuge and breeding ground for otters and awareness campaigns.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Pirineo Oriental
River basin Tordera

Subcatchment

River name Tordera
Area category
Area (km2)
Maximum altitude category Less than 100 m
Maximum altitude (m) 25 m0.025 km <br />2,500 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover Urban
Waterbody ID



Other case studies in this subcatchment: Fluvial river restoration of Tordera in Tordera, Sustainable management, at local level, of the alluvial aquifer of the River Tordera, through the reuse of waste water


Site

Edit site
Name Río Tordera en Sant Celoni
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started 2005/01/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources ACA, Accionatura

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology Continuity for organisms, Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project Landscape enhancement


Measures

Edit Measures
Structural measures
Bank/bed modifications Embankments revegetation, Removal of exotic plants
Floodplain / River corridor New habitats construction, Riparian tree planting
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement) Awareness campaigns
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery


Aerial view of the restoration area
River before works
River before works
Plantation in 2005
Naturalization of a riprap


Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information