Case study:Remediation and revitalization of Séd-Nádor stream
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: 47° 6' 27.73" N, 18° 3' 28.29" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Water quality, Habitat and biodiversity |
Country | Hungary |
Main contact forename | László |
Main contact surname | Mag |
Main contact user ID | |
Contact organisation | Séd-Nádor 2009 Consortium |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Danube |
Subcatchment
River name | Séd-Nádor stream (Sárvíz) |
---|---|
Area category | 100 - 1000 km² |
Area (km2) | 733 km²73,300 ha <br /> |
Maximum altitude category | 100 - 200 m |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Hungarian Lowlands |
Dominant land cover | Intensive agriculture (arable), Plantation forestry, Woodland, Grassland, Wetland |
Waterbody ID |
Site
Name | |
---|---|
WFD water body codes | HU RW AAA102 |
WFD (national) typology | AEP819 |
WFD water body name | |
Pre-project morphology | Single channel, Straightened |
Reference morphology | Sinuous, Step-pool |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | EU - Special Area of Conservation |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Sand, Silt, Gravel |
River corridor land use | Intensive agriculture (arable), Plantation forestry, Grassland, Wetland |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | 1616 m <br />0.016 km <br />1,600 cm <br /> |
Average bankfull channel depth category | 2 - 5 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2009/03/01 |
Works started | 2011/07/01 |
Works completed | |
Project completed | |
Total cost category | 5000 - 10000 k€ |
Total cost (k€) | 5200 k€5,200,000 € <br /> |
Benefit to cost ratio | |
Funding sources | National |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | 1000 - 5000 k€ | 1470 k€1,470,000 € <br /> | Séd-Nádor 2009 Consortium | László | Mag |
Stakeholder engagement and communication | 100 - 500 k€ | 203 k€203,000 € <br /> | Séd-Nádor 2009 Consortium | László | Mag |
Works and works supervision | 1000 - 5000 k€ | 3400 k€3,400,000 € <br /> | Séd-Nádor 2009 Consortium | László | Mag |
Post-project management and maintenance | Séd-Nádor 2009 Consortium | László | Mag | ||
Monitoring | 100 - 500 k€ | 109 k€109,000 € <br /> | Séd-Nádor 2009 Consortium | László | Mag |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Substrate conditions |
Biology | |
Physico-chemical | Specific non-synthetic pollutants |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Construction of gravel banks, Removal of sludge, Planting, Creation of fish spawn nursing places |
Floodplain / River corridor | |
Planform / Channel pattern | introducing sinuosity |
Other | |
Non-structural measures
| |
Management interventions | Reduced pollution |
Social measures (incl. engagement) | |
Other | Information provision, Consultation |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Substrate conditions | Yes | Improvement |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Fish: Species composition | Yes | Awaiting results | ||||
Invertebrates |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Specific non-synthetic pollutants | Yes | Improvement |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|