Case study:Lower Aurino river: Gatzaue riverbed widening
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Flood risk management, Habitat and biodiversity, Hydromorphology, Social benefits, Spatial planning |
Country | Italy |
Main contact forename | Caterina |
Main contact surname | Ghiraldo |
Main contact user ID | |
Contact organisation | Provincia Autonoma di Bolzano |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
Project summary
The Aurino river is a typical Alpine watercourse (basin Area 630 km2, average discharge in summer 30-50 m3/s) subject in the past to a radical channalization (riparap) which reduced significantly the width of the riverbed and the morphological structures and dynamics and which caused a general riverbed lowering and the lost of the connection with the floodplain. In the same time the groundwater lowering caused a loss of the hygrophilous riparian forests (Alnus incana).
The riverbed widening of Aurino river in Gatzaue was planned mainly to increase the biodiversity and to invert the riverbed and grounwater lowering process.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | |
Works started | |
Works completed | |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information