Case study:RESTORATION OF THE GORIŠKI BREŽIČEK STREAM
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: none specified
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Slovenia |
Main contact forename | Tanja |
Main contact surname | Vasilevska |
Main contact user ID | |
Contact organisation | Notranjski regijski park |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Sava River |
Subcatchment
River name | Goriški Brežiček |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | 500 - 1000 m |
Maximum altitude (m) | |
Dominant geology | Organic (i.e. Peat), Calcareous |
Ecoregion | Dinaric Western Balkan |
Dominant land cover | Wetland, Extensive agriculture, Woodland |
Waterbody ID |
Site
Name | watercourses Goriški Brežiček |
---|---|
WFD water body codes | |
WFD (national) typology | SI141VT2 VTJ Cerkniško jezero (Cerknica lake) |
WFD water body name | |
Pre-project morphology | Straight |
Reference morphology | Sinuous, Higher groundwater level |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | EU - Special Area of Conservation |
Local/regional site designations | Ramsar |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Ephemeral |
Dominant substrate | Silt, Sand, Gravel |
River corridor land use | Wetland, Extensive agriculture |
Average bankfull channel width category | 2 - 5 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 0.160.16 m³/s <br />160 l/s <br /> |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2007/01/01 |
Works started | |
Works completed | 2009/12/01 |
Project completed | |
Total cost category | |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources | Notranjska Regional Park, Municipality of Cerknica, Ministry of Environment and Spatial Planning |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | Notranjska Regional Park | ||||
Stakeholder engagement and communication | |||||
Works and works supervision | TGM Bizjak | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | excavation in the U form, construction of small wooden weir to prevent uncontrolled deepening, coves and bays construction |
Floodplain / River corridor | bigger flood area |
Planform / Channel pattern | re-instatement of old course, introducing sinuosity |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|