Case study:River restoration in the irrigation area Lobón (Badajoz)
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | CHGuadiana |
Main contact surname | CHGuadiana |
Main contact user ID | |
Contact organisation | |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The planned actions are part of the irrigable area of Lobón, specifically in the following rivers: Guadajira River (19.05 km), Arroyo del Entrín Verde (7.6 km), Arroyo del Golfín (4.9 km) and Arroyo Valdehombres Colorado (2.1 km). The Montijo Irrigation Area is located northwest of the province of Badajoz, on the right bank of the Guadiana River, between Merida and Badajoz, with an area of 14.99 ha. The channels included in the project are located in the municipalities of Badajoz, Merida, Talavera la Real and Lobón.
The main actions are: Silvicultural treatment on existing vegetation and trees progressive elimination of foreign species; Plantations with native species for restoration of vegetation cover; Cleaning of sludge and invasive vegetation in rivers; Performances of landscaping: removal of debris, waste, rubbish, demolition of concrete, etc.; Protection and promotion of wildlife: placing artificial nests, artificial shelters, etc.; Reorganization of the social use: install interpretive and informative signage and marking of pedestrian paths using the existing paths; and Control and monitoring environmental, legal advice.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Guadiana |
---|---|
River basin | Guadiana |
Subcatchment
River name | Guadiana river |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | 222 m0.222 km <br />22,200 cm <br /> |
Dominant geology | Siliceous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | Intensive agriculture |
Waterbody ID |
Other case studies in this subcatchment: LIFE Saramugo, VALAGUA (Valorização ambiental e gestão integrada da água e dos habitats no Baixo Guadiana transfronteiriço)
Site
Name | Río Guadajira, arroyo del Entrín Verde, arroyo del Golfín y arroyo Colorado de Valdehombres |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | EU - Special Protected Area |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 33650 m33.65 km <br />3,365,000 cm <br /> |
---|---|
Project started | 2008/01/01 |
Works started | |
Works completed | |
Project completed | |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 1999 k€1,999,000 € <br /> |
Benefit to cost ratio | |
Funding sources | C.H.Guadiana |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Channel pattern/planform, Structure & condition of riparian zones |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Revetmens with local species |
Floodplain / River corridor | Removal of sediments, Silvicultural treatments |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | Control and environmental monitoring, legal advice |
Social measures (incl. engagement) | New river information panel |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|