Case study:River restoration in the irrigation area Lobón (Badajoz)

From RESTORE
Revision as of 12:57, 28 December 2012 by CIREF AI (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 38° 52' 8.82" N, 6° 39' 5.53" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Spain
Main contact forename CHGuadiana
Main contact surname CHGuadiana
Main contact user ID
Contact organisation
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The planned actions are part of the irrigable area of Lobón, specifically in the following rivers: Guadajira River (19.05 km), Arroyo del Entrín Verde (7.6 km), Arroyo del Golfín (4.9 km) and Arroyo Valdehombres Colorado (2.1 km). The Montijo Irrigation Area is located northwest of the province of Badajoz, on the right bank of the Guadiana River, between Merida and Badajoz, with an area of 14.99 ha. The channels included in the project are located in the municipalities of Badajoz, Merida, Talavera la Real and Lobón. The main actions are: Silvicultural treatment on existing vegetation and trees progressive elimination of foreign species; Plantations with native species for restoration of vegetation cover; Cleaning of sludge and invasive vegetation in rivers; Performances of landscaping: removal of debris, waste, rubbish, demolition of concrete, etc.; Protection and promotion of wildlife: placing artificial nests, artificial shelters, etc.; Reorganization of the social use: install interpretive and informative signage and marking of pedestrian paths using the existing paths; and Control and monitoring environmental, legal advice.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district C.H.Guadiana
River basin Guadiana

Subcatchment

River name Guadiana river
Area category
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 222 m0.222 km <br />22,200 cm <br />
Dominant geology Siliceous
Ecoregion Ibero-Macaronesian
Dominant land cover Intensive agriculture
Waterbody ID



Other case studies in this subcatchment: LIFE Saramugo, VALAGUA (Valorização ambiental e gestão integrada da água e dos habitats no Baixo Guadiana transfronteiriço)


Site

Edit site
Name Río Guadajira, arroyo del Entrín Verde, arroyo del Golfín y arroyo Colorado de Valdehombres
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation EU - Special Protected Area
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m) 33650 m33.65 km <br />3,365,000 cm <br />
Project started 2008/01/01
Works started
Works completed
Project completed
Total cost category 1000 - 5000 k€
Total cost (k€) 1999 k€1,999,000 € <br />
Benefit to cost ratio
Funding sources C.H.Guadiana

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology Channel pattern/planform, Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications Revetmens with local species
Floodplain / River corridor Removal of sediments, Silvicultural treatments
Planform / Channel pattern
Other
Non-structural measures
Management interventions Control and environmental monitoring, legal advice
Social measures (incl. engagement) New river information panel
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery


Map of the restoration area in Lobon River
Aerial view of the restoration area
River corridor condition before works
River corridor condition before works


Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information