Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Maria Luisa |
Main contact surname | Prada Hervella |
Main contact user ID | |
Contact organisation | Unión Fenosa Generación |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The situation of the Frieira dam is at about 68 Km from the flow into the river Miño in the Atlantic Ocean and constitutes the first transverse obstacle for the movement of the migratory fish. Until the construction of the dam, it was only crossed by a limited number of eels that were crossed by a small scale of poor efficiency. The rest of the migratory species (Atlantic salmon, sea trout or reo, lamprey, alosa and sábalo) saw their reproductive migration water up stopped, being out of their reach the traditional spawn zones.
With the execution of this project it is being trying to correct the environment impact produced by the exploitation of the Frieira installations, reinstituting the free circulation of the migratory fish water up the storage dam; In this way, it has been recuperated for these populations courses of the basin that were used for the reproduction and breeding before the dam construction.
This project counts with the support of local, regional, national and European institutions. The financing comes from the LIFE initiative and the Government of Galicia. The total budget is 1.278.875€ (LIFE support 291.342€).
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Minho-Sil |
---|---|
River basin | Minho |
Subcatchment
River name | Minho |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | Less than 100 m |
Maximum altitude (m) | 60-68 m"-68m" is not declared as a valid unit of measurement for this property. |
Dominant geology | Siliceous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Site
Name | Escala de peces en la Central Hidoeléctrica de Frieira |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 1999/11/01 |
Works started | |
Works completed | 2002/06/01 |
Project completed | |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 1278 k€1,278,000 € <br /> |
Benefit to cost ratio | |
Funding sources | LIFE project 291.342€, Galicia Government |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Unión Fenosa S.A. | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Continuity for organisms |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | Installing fish scale of more than 250m |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Continuity for organisms | Yes | Yes | Yes | No change |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|