Case study:Rio Tepice urban restoration
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: 45° 0' 15.84" N, 7° 29' 24.00" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Italy |
Main contact forename | Guido |
Main contact surname | Blanchard |
Main contact user ID | |
Contact organisation | Studio Blanchard-Gallo |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Po |
---|---|
River basin | Po Piemontese |
Subcatchment
River name | Tepice |
---|---|
Area category | 10 - 100 km² |
Area (km2) | 15 km²1,500 ha <br /> |
Maximum altitude category | 500 - 1000 m |
Maximum altitude (m) | 660 m0.66 km <br />66,000 cm <br /> |
Dominant geology | Calcareous, Mixture |
Ecoregion | Italy and Corsica |
Dominant land cover | Urban, Woodland |
Waterbody ID |
Site
Name | Rio Tepice in Chieri |
---|---|
WFD water body codes | 0010941pi |
WFD (national) typology | 06SS2T |
WFD water body name | |
Pre-project morphology | Single channel, High width:depth |
Reference morphology | Pool-riffle |
Desired post project morphology | |
Heavily modified water body | true |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Quick run-off |
Dominant substrate | Cobble |
River corridor land use | Urban |
Average bankfull channel width category | Less than 2 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 1.51.5 m³/s <br />1,500 l/s <br /> |
Average channel gradient category | |
Average channel gradient | 0.013 |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 250 m0.25 km <br />25,000 cm <br /> |
---|---|
Project started | 1993/03/01 |
Works started | 1996/05/01 |
Works completed | 1997/12/01 |
Project completed | |
Total cost category | 100 - 500 k€ |
Total cost (k€) | 123 k€123,000 € <br /> |
Benefit to cost ratio | |
Funding sources | Piermonte region, Chieri municiplaity |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | 1 - 10 k€ | 7 k€7,000 € <br /> | Studio Blanchard-Gallo | Guido | Blanchard |
Stakeholder engagement and communication | |||||
Works and works supervision | 100 - 500 k€ | Studio Blanchard-Gallo | Guido | Blanchard | |
Post-project management and maintenance | 10 - 50 k€ | Chieri municiplaity | |||
Monitoring | “Il tuo Parco” association | Luca | Bruno |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Channel pattern/planform |
Biology | |
Physico-chemical | Nutrient concentrations |
Other reasons for the project | Landscape enhancement |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | embankement renaturalization |
Floodplain / River corridor | Riparian tree planting |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | Management of paths |
Social measures (incl. engagement) | Pubblic green area building |
Other | Participation in monitoring |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Structure & condition of riparian zones | Yes | Yes | Yes | Improvement |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Ex ante status "Il Rio Tepice nel suo Viaggio verso il Po" Ass. Il tuo Parco |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|