Case study:Creation and restoration of a riparian zone
This case study is pending approval by a RiverWiki administrator.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | Fernando |
Main contact surname | Mendoza |
Main contact user ID | |
Contact organisation | Gestión Ambiental Viveros y Repoblaciones de Navarra, S.A. |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Soto of Campollano is downstream Carcastillo town. The work area was located on the left Aragon River bank, where the little tributary Abejar ravine flows into the Aragon River. The tributary of Aragon is surrounded in its mouth by a river forest of 32.6 has called Soto de Campollano represented by the habitat 92AO in a good conservation status. In the riversides there are areas of grasslands.
The main objective of this project is to increase the quality of habitat in Community Interest Areas, with special attention to European mink (Mustela lutreola). There are other secondary objectives: Creating new habitats for otter (Lutra lutra) and turtle (Emys orbicularis); quality improvement of habitats 92A0 (willow and black poplar plantation) and 3150.
The project includes the creation of some new habitats that affect animals and plants. New bio-engineering techniques are used to develop and help these riparian communities.
The project was presented by the “Environmental Management for Reintroduction and Repopulation in Navarre” in cooperation with the Government of Navarre’s Environment, Land and Housing Department. It was part of a LIFE project.
Monitoring surveys and results
Lessons learnt
Catchment and subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Ebro |
---|---|
River basin | Aragón |
Subcatchment
River name | Aragón |
---|---|
Area category | 1000 - 10000 km² |
Area (km2) | |
Maximum altitude category | 200 - 500 m |
Maximum altitude (m) | 350 m0.35 km <br />35,000 cm <br /> |
Dominant geology | |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | Extensive agriculture |
Waterbody ID |
Other case studies in this subcatchment: Restoration of riparian zone in Aragon River
Site
Name | Soto de Campollano |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | Sinuous, Single channel |
Reference morphology | Sinuous, Single channel |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | Habitat 92AO |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | Quick run-off, Artificially regulated |
Dominant substrate | |
River corridor land use | Plantation forestry, Intensive agriculture, Wetland |
Average bankfull channel width category | 10 - 50 m |
Average bankfull channel width (m) | |
Average bankfull channel depth category | 2 - 5 m |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 211 m0.211 km <br />21,100 cm <br /> |
---|---|
Project started | |
Works started | 2005/08/01 |
Works completed | 2006/02/01 |
Project completed | |
Total cost category | 50 - 100 k€ |
Total cost (k€) | |
Benefit to cost ratio | |
Funding sources |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Construction of three small ponds connected through small meandering channels |
Floodplain / River corridor | River forest has been restored through the plantation of species typical from habitat 92AO |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|