Case study:The Fortuna Restoration Project

From RESTORE
Revision as of 08:22, 16 November 2012 by Marinela (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 45° 11' 28.43" N, 29° 8' 53.17" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Romania
Main contact forename Marian
Main contact surname Tudor
Main contact user ID
Contact organisation The Danube Delta Biosphere Reserve Authority
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district Danube
River basin

Subcatchment

River name Sulina Branch
Area category Less than 10 km²
Area (km2) 2.115 km²211.5 ha <br />
Maximum altitude category Less than 100 m
Maximum altitude (m) 1.50 m0.0015 km <br />150 cm <br />
Dominant geology Organic (i.e. Peat), clay
Ecoregion Pontic Province
Dominant land cover Grassland, Reed
Waterbody ID



Site

Edit site
Name Forestry polder Fortuna
WFD water body codes RORW14.1_B5
WFD (national) typology RO15
WFD water body name
Pre-project morphology Embanked, Forestry area
Reference morphology Sinuous, Artificial channel
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations RAMSAR site, Biosphere Reserves
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Artificially regulated, Inundabila area
Dominant substrate Clay, Peat
River corridor land use Grassland, Wetland
Average bankfull channel width category 10 - 50 m
Average bankfull channel width (m) 15.0015 m <br />0.015 km <br />1,500 cm <br />
Average bankfull channel depth category 0.5 - 2 m
Average bankfull channel depth (m) 1.5 m0.0015 km <br />150 cm <br />
Mean discharge category
Mean annual discharge (m3/s) 69.769.7 m³/s <br />69,700 l/s <br />
Average channel gradient category
Average channel gradient 0.015
Average unit stream power (W/m2) 683.5479683.548 W/m² <br />


Project background

Edit project background
Reach length directly affected (m)
Project started 1999/12/01
Works started 2004/03/01
Works completed 2004/11/01
Project completed
Total cost category more than 10000 k€
Total cost (k€) 2093000 k€2,093,000,000 € <br />
Benefit to cost ratio
Funding sources GEF – BM Programe

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design The Danube Delta Biosphere Reserve Authority, Tulcea Marian Tudor
Stakeholder engagement and communication The Danube Delta Biosphere Reserve Authority, Tulcea
Works and works supervision The Danube Delta Biosphere Reserve Authority, Tulcea
Post-project management and maintenance The Danube Delta Biosphere Reserve Authority, Tulcea
Monitoring The Danube Delta National Institute for Research and Development, Tulcea (office@indd.tim.ro) Marian Tudor



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure Flood risk management
Hydromorphology Quantity & dynamics of flow, Continuity for organisms, Width & depth variation
Biology Fish, Macrophytes, Phytoplankton
Physico-chemical Nutrient concentrations
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications Create breaches in the bank
Floodplain / River corridor
Planform / Channel pattern Connecting Fishpond Fortuna to the Danube regime
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Quantity & dynamics of flow Improvement
Continuity of sediment transport

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish Improvement
Invertebrates
Macrophytes
Phytoplankton
Zooplancton

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Nutrient concentrations Improvement
Salinity
pH
Oxygen balance
Temperature

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
medicinal plants Improvement


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information