Category:Imported case study
Jump to navigation
Jump to search
This category contains all case studies that were imported from Excel spreadsheets, via the conversion tool and Special:ImportXML.
Pages in category "Imported case study"
The following 200 pages are in this category, out of 424 total.
(previous page) (next page)A
- Case study:Aaijen- Removal of bank fixation
- Case study:Actions for environmental regeneration and flow control in Odra's Basin, Burgos
- Case study:Adaptive management of hydraulic structures in the Sèvre nantaise and Thouet basins
- Case study:Agreed definition of mobility area for the Adour
- Case study:Amwell Loop
- Case study:Arnos Park - Pymmes Brook
- Case study:Ashlone Wharf FCRM scheme
B
- Case study:Barn Elms Sports Ground
- Case study:Barn Elms Wetland Centre, South West London
- Case study:Barnes Common
- Case study:Barnes Common improvements
- Case study:Barton Brook
- Case study:Basic proposals for restoration and enhancement of the stream of Vilamajor in Sant Antoni de Vilamajor
- Case study:Beddington Park
- Case study:Beddington Park Enhancements
- Case study:Bell Green Weir fish passage
- Case study:Beneden-Leeuwen-Side channel
- Case study:Beverley Brook d/s of Rock’s Lane
- Case study:Beverley Brook Flow control structures
- Case study:Beverley Park
- Case study:Big Yellow
- Case study:Biodiversity conservation and recovery in the river basin Asón
- Case study:Biologisk återställning i Rolfsåns vattensystem
- Case study:Biomura LIFE06NAT/SI/000066
- Case study:Blackhorse Lane Waterfront Park
- Case study:Blake Avenue, Mayes Brook
- Case study:Bleinheim Palace Project
- Case study:Bonesgate Phase 2
- Case study:Boosting slivso
- Case study:Boston Manor
- Case study:Boulder Pool and Plough Lane
- Case study:Brent Lodge Park Improvement
- Case study:Brent River Park Phase II
- Case study:Broadway Fields/ Seagers Distillary
- Case study:Broom Road Recreation Ground
- Case study:Buenz
- Case study:Buiten Ooij
- Case study:Bullhead Dock and Bellamy’s Wharf - Rotherhithe
- Case study:Bury Lodge Wetlands
- Case study:Buzzards Mouth Creek
C
- Case study:Catford Greyhound Stadium
- Case study:Channel Sea
- Case study:Chase Nature Reserve
- Case study:Chertsey meads
- Case study:Chiese river upstream Idro lake – Trentino region
- Case study:Chigwell Brook
- Case study:Ching Brook at Walthamstow Greyhound Stadium
- Case study:Chícamo Life project. Conservation of Aphanius iberus´ genetics stocks (Murcia )
- Case study:Civic Way, Yeading Brook
- Case study:Clitherow's Island, Brentford eel pass
- Case study:Colfes School
- Case study:Colliers Row
- Case study:Colne Brook
- Case study:Columbia Wharf
- Case study:Conservation the public water domain in the Tajo basin, t. m. Alcocer, province of Guadalajara.
- Case study:Control and permeabilization of the marsh to the river, the Brazo de la Torre and Entremuros
- Case study:County Gardens, Mayes Brook
- Case study:Crane Park
- Case study:Cranford Park Phase 2
- Case study:Cray River Enhancement
- Case study:Creation and restoration of a riparian zone
- Case study:Cuddington Park
- Case study:Cumbria Angler Engagement
D
- Case study:Dagenham Brook de-silting
- Case study:Dagenham Washlands Phase 2
- Case study:Darent Valley Path
- Case study:Demolition of weir on the River Nora, Nalón Basin
- Case study:Design and Application of a Sustainable Soil Management Model for Orchard Crops in the Doñana National Park Area
- Case study:Diffusing the Issue in rural Ribble
- Case study:Diffusing the Issue in rural Ribble - Easington
- Case study:Diffusing the Issue in rural Ribble - Skirden Beck
- Case study:Diffusing the Issue in rural Ribble - Stock Beck
- Case study:Diffusing the Issue in rural Ribble - Swanside
- Case study:Dove Weir removal
- Case study:Dovers Corner
- Case study:Doñana 2005
- Case study:Durand Close
E
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 1
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 2
- Case study:Ecological reconstruction of islands resulted after Sf. Gheorghe Arm rectification - project 3
- Case study:Ecological Restoration of Mata-Radeanu Complex
- Case study:Ecological Restoration of Natural Lake Pochina
- Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin
- Case study:Ecological Restoration of Vlascuta Lake
- Case study:ECOREMEDIATION SYSTEM (ERM) FOR TREATMENT OF POLLUTED TRIBUTARY OF GLINŠČICA
- Case study:EDF Weir removal
- Case study:Edgeware Brook, Honeypot Lane
- Case study:Eel Pass over tilting weir at Ravensbury Park
- Case study:Elmbridge Meadows
- Case study:Ems floodplain
- Case study:Enhancements in Hampstead Heath
- Case study:Environmental improvement intervention in a reach Anzur River in the village of El Nacimiento, in the Municipality of Rute (Cordoba)
- Case study:Environmental improvement project of the stream of Ruby
- Case study:Environmental regeneration project in Magro river bed
- Case study:Environmental restoration of the lower section of the river Narcea in the municipalities of Salas and Pravia (Asturias)
- Case study:Environmental restoration of the river Zújar
- Case study:Environmental restoration project of the Guadajoz River (Castro del Río, Andalusia)
- Case study:Environmental restoration project of the river area of the Ripoll River as it passes through the municipality of Ripollet (Vallès Occidental)
- Case study:Essex Healthy Headwaters River Restoration Project
- Case study:Essex Wharf
F
- Case study:Fairlop Plain and Fairlop Water
- Case study:Farm Irrigation Trials
- Case study:Farming with water - Ullswater Catchment
- Case study:Fazakerley Brook Wetland
- Case study:Ferry Lane North drainage realignment
- Case study:Fish and Flow at Arcadia - Phase 2
- Case study:Fishery/habitat enhancement on the Grand Union Canal
- Case study:Fluvial improvement in Riera de Caldés
- Case study:Fluvial longitudinal continuity recovery in river Aguanaz, Cantabria, Spain
- Case study:Fluvial restoration in River Carrión
- Case study:Fluvial river restoration of Tordera in Sant Celoni
- Case study:Fluvial river restoration of Tordera in Tordera
- Case study:Fordmill weir
- Case study:Fresh Wharf
- Case study:Friary Park
- Case study:Friern Barnet Former Sewage Works
- Case study:Frog Island
G
- Case study:Garratt Park
- Case study:Goodmayes Park, Mayes Brook
- Case study:Goresbrook and Ship and Shovel Sewer
- Case study:Goresbrook Park
- Case study:Guadiamar Green Corridor Project
- Case study:Guadiato Life project Model for restoring and integrating water resources in a mining area, actions for an alternative development
H
- Case study:Habitat and water flow restoration on River Rábca
- Case study:Habitat improvement project in Segre river, in Alòs de Balaguer
- Case study:Habitat Improvement: Stonebridge River Reserve, Og and Marlborough Fish Migration
- Case study:Habitat Improvements on the River Colne at West Drayton
- Case study:Hackbridge Restoration
- Case study:Hackbridge weir notch
- Case study:Hackney Marsh recreation grounds
- Case study:Hackney Marshes - Wick Field recreation ground
- Case study:Hale Wharf
- Case study:Hall Place weir modification
- Case study:Hampton Court Palace
- Case study:Harrow Lodge Park
- Case study:Haynes Park
- Case study:Hogsmill River Connectivity Project
- Case study:Hogsmill Sewage Treatment Works phase 1
- Case study:Hollyoak Wood and Willersley Park
- Case study:Horne Way Weir
- Case study:Hospital Bridge Road
- Case study:HPP Blanca
- Case study:Hurst Park
I
- Case study:Improved longitudinal continuity of the Lozoya River, upstream the Pinilla dam (Madrid)
- Case study:Improvement of ecological state of the river Pisuerga between the dam of Aguilar de Campo and Alar del Rey (Palencia) - 1st Stage.
- Case study:Improvement of the Terri River in the industrial zone (Phase I and II)
- Case study:Improving the ecological status of the Black River and tributaries (Zamora)
- Case study:Improving the structure of the Lahn-patak in Hungary
- Case study:Improving water quality in Loweswater
- Case study:Inchewan Burn Bed restoration
- Case study:Increased biodiversity, river Llobregat, Sallent.
- Case study:International recovery of the river Minho: an example of sustainable hydraulic exploitation
- Case study:Isar-Plan
K
L
- Case study:Ladywell Fields (QUERCUS)
- Case study:Ladywell Fields Phase 2
- Case study:Ladywell Fields to Cornmill Gardens
- Case study:Ladywell Fields toeboarding
- Case study:Lake District Foundation - Building future environmental investment
- Case study:Land at Buzzards Mouth Creek
- Case study:Land opposite Wanstead Park
- Case study:Langford Lakes project
- Case study:Langonnet river
- Case study:Laymer Road Silt Trap and Recreational Ground
- Case study:Lea Bridge Waterway Wall Improvements
- Case study:Lee Navigation by Walthamstow Marshes
- Case study:Lek Bij Everdingen
- Case study:Lewisham College weir
- Case study:Lidl
- Case study:LIFE 06 NAT/SLO/000069 Intermittent Lake Cerknica
- Case study:Linear Park
- Case study:Lippeaue Klostermersch
- Case study:Llobregat river restoration
- Case study:Love My River Douglas
- Case study:Loxford Water
- Case study:Lullingstone Castle phase 2
M
- Case study:Malden Golf Course
- Case study:Manor House Gardens
- Case study:Manor House Gardens Gauging Station
- Case study:Marsh restoration on the Merlue
- Case study:Matasaru Area - A new life on the river Arges
- Case study:Meades water garden regeneration project
- Case study:Medland Close, River Wandle
- Case study:Meers - Floodplain lowering
- Case study:Melling Brook
- Case study:Merdian Water development site
- Case study:Merton Abbey Mills Eel Pass
- Case study:Mid Thame RIver and Floodplain Project
- Case study:Mill Green
- Case study:Mill Road Weir
- Case study:Millingerwaard-Floodplain rehabilitation
- Case study:Moor Lane Allotments
- Case study:Morava restoration project
- Case study:Morden Hall
- Case study:Morden Hall Park Water Vole Habitat Enhancement