Case study:Renaturation of Stržen's riverbed on intermittent Cerknica Lake

From RESTORE
Revision as of 12:49, 17 May 2023 by AnaStržen (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

4.00
(one vote)


To discuss or comment on this case study, please use the discussion page.


Location: none specified



Project overview

Edit project overview
Status
Project web site
Themes
Country
Main contact forename
Main contact surname
Main contact user ID
Contact organisation
Contact organisation web site
Partner organisations
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Arrival of mechanisation at the entry to the lake
Excavators are waiting at the entry to the lake for suitable conditions to start work
Preparation of access roads proved to be tricky due to rainfall.
Due to the wet terrain we had to strenghten the access road with gravel.
In 2020, unfortunately the works could not continue due to high water levels.
ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Channel pattern/planform Yes Yes No No Yes Improvement
Flow velocities Yes Yes No No No Improvement
Quantity & dynamics of flow Yes Yes No No Yes Improvement
Width & depth variation Yes Yes No No No Improvement

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Macrophytes Yes Yes No No Yes Improvement
Macrophytes and/or phytobenthos: Taxonomic composition Yes Yes No No Yes Improvement
Macrophytes and/or phytobenthos: Average abundance Yes Yes No No Yes Improvement
Invertebrates Yes Yes No No Yes Improvement
Invertebrates: Abundance No No No No No Improvement
Invertebrates: Diversity Yes Yes No No Yes Improvement
Invertebrates: Taxonomic composition Yes Yes No No Yes Improvement

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
PH Yes Yes No No Yes Improvement
Temperature Yes Yes No No Yes No change
Oxygen balance Yes Yes No No Yes Improvement

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://ec.europa.eu/environment/life/project/Projects/index.cfm?fuseaction=search.dspPage&n proj id=6296#EI European Commission article about the project
http://life.notranjski-park.si/en/ Official project website (English)

Supplementary Information

Edit Supplementary Information