Case study:Beekherstel Buurserbeek
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | Environmental flows and water resources, Flood risk management, Habitat and biodiversity, Monitoring |
Country | Netherlands |
Main contact forename | John |
Main contact surname | Lenssen |
Main contact user ID | |
Contact organisation | Waterschap Rijn en Ijssel |
Contact organisation web site | http://www.wrij.nl/ |
Partner organisations | STOWA |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
Project summary
The Buurserbeek is now a slow-flowing, strongly normalized stream. It is partially located in an agricultural area, but most of the stream flows through woods are natural areas (e.g. Buurserzand and the woods east of Haaksbergen) and/or has woody vegetation on its banks. A 4 meter wide maintenance path runs parallel to most of the stream and the entire stream runs between embankments or high grounds. Upstream of the Twenteroute, the stream carries water most of the year and in most places, the flow velocity is sufficient to support flow-loving fish. Downstream of the Twenteroute, the discharge mostly stops in summer, causing the stream to become stagnant. There is intensive maintenance in the reaches downstream of Braambrug. The Buurserbeek does not yet meet its ecological targets. The stream is too deep and has insufficient variation in structure. Nutrient levels remain to high in the Buurserbeek as well. This is mostly caused by upstream pollution in Germany.
The stream can meander freely within its embankments. The stream is shallow and wide and features both sand bars and stream pits, as well as dead wood and a local lush aquatic vegetation. Most of the stream corridor (80%) is wooded. The Buurserbeek is completely accessible to fish.
Monitoring surveys and results
Lessons learnt
Image gallery
Catchment and subcatchmentSelect a catchment/subcatchment
Catchment
Subcatchment
Other case studies in this subcatchment: Beekherstel Zuidelijk Afwateringskanaal, Traditioneel Beekherstel Koffiegoot
Site
Project background
Cost for project phases
Reasons for river restoration
Measures
MonitoringHydromorphological quality elements
Biological quality elements
Physico-chemical quality elements
Any other monitoring, e.g. social, economic
Monitoring documents
Additional documents and videos
Additional links and references
Supplementary InformationEdit Supplementary Information
|