Case study:Osink-Bemersbeek

From RESTORE
Revision as of 10:38, 9 February 2021 by Bas Wullems (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 56' 9.69" N, 6° 46' 30.17" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity
Country Netherlands
Main contact forename John
Main contact surname Lenssen
Main contact user ID
Contact organisation Waterschap Rijn en Ijssel
Contact organisation web site http://www.wrij.nl
Partner organisations
Parent multi-site project

Building with nature measures in streams

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The Osink-Bemersbeek is a tributary of the river Boven Slinge. It flows through a largely agricultaral area, with small patches of bank-lining vegetation. The stream yearly dries up in dry periods. The river system already has a rather good ecological quality, although it still suffers from a high nutrient load. The water authority plans to restore the entire river system to its fully meandering origins, with wide wooded buffer strips. In order to improve the ecological quality of this stream, more trees were planted on the banks and packages of dead wood were introduced by the side of the stream.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Rijn
River basin Rijndelta

Subcatchment

River name Oude IJssel
Area category 1000 - 10000 km²
Area (km2) 12001,200 km² <br />120,000 ha <br />
Maximum altitude category Less than 100 m
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion Central Plains
Dominant land cover Grassland, Intensive agriculture (arable), Broadleaf/mixed woodland (semi natural), Urban
Waterbody ID NL07_0006



Site

Name Osink-Bemersbeek
WFD water body codes NL07_0009
WFD (national) typology R5
WFD water body name Boven Slinge
Pre-project morphology Straightened
Reference morphology Actively meandering
Desired post project morphology Straightened
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate Sand
River corridor land use Grassland, Intensive agriculture (arable)
Average bankfull channel width category Less than 2 m
Average bankfull channel width (m)
Average bankfull channel depth category Less than 0.5 m
Average bankfull channel depth (m)
Mean discharge category Less than 0.1 m³/s
Mean annual discharge (m3/s) 0.030.03 m³/s <br />30 l/s <br />
Average channel gradient category Less than 0.001
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information