File:20200114 095551.jpg

From RESTORE
Revision as of 08:19, 12 March 2020 by KarCie (talk | contribs) (Bobowa (km 58+700 Biala river). New construction finished in 2018. In upstream circa 150 m above existing weir fish ramp was built. Below was 70 m length pool and downstream rebuilded old weir with stilling basin. The crest was slightly forged...)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Original file(3,166 × 2,660 pixels, file size: 7.23 MB, MIME type: image/jpeg)

Bobowa (km 58+700 Biala river). New construction finished in 2018. In upstream circa 150 m above existing weir fish ramp was built. Below was 70 m length pool and downstream rebuilded old weir with stilling basin. The crest was slightly forged and in the middle triangle overflow was cuted. A triangular spillway was also cut out in end sill of countersill. The structure was supported by loose riprap and a row of sandstone boulders.The soil that had been deposited over the years under the bridge message was removed. The riverbed widened. The conditions for the flow of great waters have improved.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current08:19, 12 March 2020Thumbnail for version as of 08:19, 12 March 20203,166 × 2,660 (7.23 MB)KarCie (talk | contribs)Bobowa (km 58+700 Biala river). New construction finished in 2018. In upstream circa 150 m above existing weir fish ramp was built. Below was 70 m length pool and downstream rebuilded old weir with stilling basin. The crest was slightly forged...