Case study:Bird reserve “Las Marismas Blancas” (Cantabria)

From RESTORE
Revision as of 10:41, 22 October 2019 by Wetnet (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 43° 24' 36.39" N, 3° 49' 16.38" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site http://www.seo.org/reservas-ornitologicas/
Themes Environmental flows and water resources, Habitat and biodiversity, Social benefits, Spatial planning
Country Spain
Main contact forename Felipe
Main contact surname González
Main contact user ID User:SEO BirdLife
Contact organisation SEO BirdLife
Contact organisation web site http://www.seo.org
Partner organisations SEO BirdLife, “Astillero” town hall
This is a parent project
encompassing the following
projects
Project picture

Project summary

Edit project overview to modify the project summary.


The three main objectives of the proyect are: 1) wetland management, 2) study and conservation of aquatic birds and 3) ambiental restoration.

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


The main actions have been: Implantation of amphibian ponds, fenced construction for won, elimination of invasive species, installation of artificial islets. As a result, local vegetation have been increased, new species of birds are nesting in the zone, populations of amphibians and lepidoptera are increasing.

Lessons learnt

Edit project overview to modify the lessons learnt.


The efforts in restoration of local wildlife and vegetation have been effective in this zone and the image of industrial zone is not so remarkable


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district cantabrico occidental
River basin Basin “Mieray del Campiazo”

Subcatchment

River name Ria de Boó y Astillero
Area category
Area (km2) 0.410.41 km² <br />41 ha <br />
Maximum altitude category
Maximum altitude (m) 2020 m <br />0.02 km <br />2,000 cm <br />
Dominant geology Continental and marine crust
Ecoregion Cantabrian mixed forest"Cantabrian mixed forest" is not in the list (Iceland, Tundra, Borealic uplands, Fenno-Scandian Shield, Great Britain, Ireland and Northern Ireland, Ibero-Macaronesian, Taiga, Central Plains, Baltic Province, ...) of allowed values for the "Ecoregion" property.
Dominant land cover Wetland
Waterbody ID



Site

Name Marismas Blancas
WFD water body codes
WFD (national) typology Coastal waters
WFD water body name Lowland, calcareous or mixed, medium-large
Pre-project morphology marsh
Reference morphology marsh
Desired post project morphology
Heavily modified water body No
National/international site designation EU - Special Area of Conservation
Local/regional site designations Special Protection Zones for Birds (SPA)
Protected species present Yes
Invasive species present Yes
Species of interest Cortaderia selloana, Sterna hirundo, Hyla arborea, Lutra lutra, Capreolus capreolus
Dominant hydrology Rivers and wetland
Dominant substrate sandstone
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 40004,000 m <br />4 km <br />400,000 cm <br />
Project started 1999/01/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information