Case study:LIFE Segura Riverlink (Through rivers)

From RESTORE
Revision as of 11:08, 28 August 2019 by SeguraCH (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: none specified



Project overview

Edit project overview
Status Complete
Project web site http://https://www.chsegura.es/chs/cuenca/segurariverlink/contacto/
Themes Fisheries, Flood risk management, Habitat and biodiversity, Hydromorphology, Monitoring
Country Spain
Main contact forename Eduardo
Main contact surname Lafuente
Main contact user ID
Contact organisation Confederación Hidrográfica del Segura
Contact organisation web site http://https://www.chsegura.es/chs/cuenca/segurariverlink/riverlink/
Partner organisations Confederación Hidrográfica del Segura (CHS), Centro Tecnológico Agrario y Agroalimentario de la Universidad de Valladolid (ITAGRA-CT), Universidad de Murcia (UMU), Dirección General de Medio Ambiente de la Región de Murcia (CARM) & Asociación de Naturalistas del Sureste (ANSE)
Parent multi-site project

LIFE12 ENV/ES/001140

This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The main objective of the project is to promote and support the environmental recovery of the Segura River Basin by improving and strengthening the connectivity between natural ecosystems, promoting the conservation of the area and improving its public use by:

1. Increasing the river ecosystems continuity and permeability in order to restore its natural dynamics and the mobility of the species along the Segura and Moratalla rivers

2. Combating ecosystem degradation and fragmentation to restore their role as ecological corridors

3. Improving the ecological status along both rivers

4. Increasing biodiversity of fluvial and riparian ecosystems

5. Promoting social awareness

6. Disseminating knowledge and transferring the results to the Segura River Basin Management Plan and to other areas with similar environmental problems

Monitoring surveys and results

Edit project overview to modify the Monitoring survey and results.


In order to validate these actions and evaluate the results, the project carried out a comprehensive monitoring program including biological, physical-chemical and hydromorphological indicators. This facilitated the subsequent transfer to the rest of the basin and other rivers with similar problems.

Monitoting actions were focused on :

+ Operation indicators at fish passage systems

+ Fish community and populations

+ Bird community and riverbanks associated fauna

+ Spatio-temporal dynamics of vegetation communities in the restored areas

+ Ecological status of water bodies and sediment monitoring in each weir

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Riverlink - demolicion azud moratalla.jpg
Riverlink - plantacion azud los charcos.jpg
Riverlink - restauracion hoya garcia.jpg
Riverlink Escala de peces.jpg
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district C. H. Segura
River basin Segura

Subcatchment

River name Segura
Area category more than 10000 km²
Area (km2) 1887018,870 km² <br />1,887,000 ha <br />
Maximum altitude category 1000 - 2000 m
Maximum altitude (m) 14131,413 m <br />1.413 km <br />141,300 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover
Waterbody ID



Other case studies in this subcatchment: Segura's River Bioremediation, Strengthening associated biodiversity of habitat 92A0 and control of Invasive Alien Species in the Segura River (LIFE + Ripisilvanatura)


Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 5400054,000 m <br />54 km <br />5,400,000 cm <br />
Project started 2013/08/01
Works started
Works completed
Project completed 2017/07/30
Total cost category 1000 - 5000 k€
Total cost (k€)
Benefit to cost ratio
Funding sources UE (49.83%)

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure Barriers to fish migration, Riparian development, Flood risk management
Hydromorphology Freshwater flow regime, Structure & condition of riparian/lake shore zones, Continuity for organisms
Biology Invasive species (Arundo Donax)
Physico-chemical
Other reasons for the project Removal of fish barriers and construction of fish passages


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://https://www.chsegura.es/export/descargas/cuenca/segurariverlink/mediateca/descargas/Publicacion Folleto-riverlink-ingles.pdf Project brochure (English)
http://https://twitter.com/segurariverlink Twitter profile of the project
http://https://www.facebook.com/segurariverlink/ Facebook profile of the project
http://https://www.miteco.gob.es/es/ceneam/recursos/pag-web/segura-riverlink-fluvial.aspx Learnig guide for scholars about the project
http://https://www.chsegura.es/export/descargas/cuenca/segurariverlink/mediateca/descargas/Publicacion Manual BuenasPracticas Riverlink.pdf Handbook of good practices for implementing land stewardship
http://https://www.chsegura.es/chs/cuenca/segurariverlink/resultados/ Link to the documents with the project outcomes

Supplementary Information

Edit Supplementary Information

THANKS FOR YOUR INTEREST IN THIS PROJECT!

To contact us with any questions, suggestions or for more information please send an email to segurariverlink@chsegura.es or do it through social networks:

Ripisilvanatura on Facebook : Segurariverlink Ripisilvanatura on Twitter : @segurariverlink