Case study:Beekherstel Lactariabeek

From RESTORE
Revision as of 13:05, 31 July 2019 by MaritJob (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 33' 52.48" N, 5° 54' 3.19" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Environmental flows and water resources
Country Netherlands
Main contact forename Waterschap
Main contact surname Aa en Maas
Main contact user ID
Contact organisation Waterschap Aa en Maas
Contact organisation web site http://www.aaenmaas.nl/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


De Lactariabeek ontspringt in Limburg. Deze beek ligt in een natuurlijk beekdal. De beek is daarom getypeerd als (R4) langzaam stromende bovenloop op zand. De beek is op veel plaatsen sterk genormaliseerd en vergraven. Toch heeft de beek hier en daar nog steeds een natuurlijk verloop. Op de Brabants-Limburgse grens kruist de beek het Afwateringskanaal met een sifon. De beek loopt deels door een bosgebied, waar de beek in de zomermaanden kan droogvallen. Vervolgens stroomt hij door een gebied met overwegend landbouw.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Lactariabeek
WFD water body codes NL38-8V
WFD (national) typology R4
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate Sand
River corridor land use Intensive agriculture (arable)
Average bankfull channel width category 2 - 5 m
Average bankfull channel width (m) 2.772.77 m <br />0.00277 km <br />277 cm <br />
Average bankfull channel depth category Less than 0.5 m
Average bankfull channel depth (m) 0.30.3 m <br />3.0e-4 km <br />30 cm <br />
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category Less than 0.001
Average channel gradient 0.00085
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2014
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information