Case study:Hierdense Beek

From RESTORE
Revision as of 14:00, 3 May 2019 by MaritJob (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 52° 19' 22.30" N, 5° 42' 17.44" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Habitat and biodiversity, Hydromorphology, Land use management - agriculture, Land use management - forestry, Monitoring
Country Netherlands
Main contact forename Christian
Main contact surname Huising
Main contact user ID
Contact organisation STOWA
Contact organisation web site http://www.sprengenbeken.nl/hierdense-beken/#Leuvenumse%20Beek
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

This case study hasn’t got any project summary, you can add some by editing the project overview.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name Leuvenumse bos
WFD water body codes
WFD (national) typology R5
WFD water body name
Pre-project morphology Single channel, licht meanderend
Reference morphology
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Natuurlijk afwaterend
Dominant substrate Sand
River corridor land use Bos
Average bankfull channel width category 5 - 10 m
Average bankfull channel width (m) 99 m <br />0.009 km <br />900 cm <br />
Average bankfull channel depth category 0.5 - 2 m
Average bankfull channel depth (m) 1.81.8 m <br />0.0018 km <br />180 cm <br />
Mean discharge category Less than 0.1 m³/s
Mean annual discharge (m3/s) 0.080.08 m³/s <br />80 l/s <br />
Average channel gradient category Less than 0.001
Average channel gradient 0.001
Average unit stream power (W/m2) 0.0871733333333330.0872 W/m² <br />


Project background

Reach length directly affected (m)
Project started 2013
Works started 2014/10/01
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Flow velocities Yes Yes No No No
Quantity & dynamics of flow Yes Yes No No No
Width & depth variation Yes Yes No No No

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Fish Yes Yes No No No
Macrophytes Yes Yes No No No
[[]] No No No No No

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information