Case study:Ecological Restoration of Natural Lake Pochina

From RESTORE
Revision as of 13:02, 1 November 2018 by Alexrrc (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 45° 59' 29.63" N, 28° 5' 46.38" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.luncaprut.ro
Themes Habitat and biodiversity
Country Romania
Main contact forename Fica
Main contact surname Boldea
Main contact user ID
Contact organisation Prut - Barlad River Basin Authority
Contact organisation web site http://www.rowater.ro/daprut/default.aspx
Partner organisations University of Bucharest – Centre for Environmental Research and Impact Studies, Romania; Romanian Ornithological Society, Romania; Galaţi Forestry District, Romania
This is a parent project
encompassing the following
projects
Ecological Restoration of Natural Lake Pochina
Lower Prut Natural Park

Project summary

Edit project overview to modify the project summary.


The Lower Prut Floodplain Natural Park is the entrance of the Danube Delta Biosphere Reserve. It lies on the flyway route of hundreds of migratory birds.More than 50 of these birds are listed in the EU Birds Directive and in the Bern Convention.The ecological importance of the park has been recognised at national as well as international levels. The project objective was to improve the conservation status of 13 priority and more than 50 non-priority bird species listed in the Birds Directive and present in the Lower Prut Floodplain Natural Park. The first phase of the multi-site project focuses on the establishment of park administrative structures and the preparation of an integrated management plan, to be approved by the local authorities. This plan would guide the conservation activities to be implemented and would consider the protection needs of target habitats and species of the project. A number of actions have been foreseen to address and involve the local community (e.g. dissemination, consultation of every village in the area, and active participation and education with local educational material to be produced). The project was addressed stakeholders in wide variety of ways, including picture books, nature trails, six annual environment days with expeditions into the area, children's exhibitions, and bird watching towers. The ecological restoration works of Pochina Lake assures, by gravitational transfer a sufficient water volum to contribute to the conservation of this special area, designated Special Protected Area (SPA).

The two channels for Vlăşcuţa Lake (in total length of about 542 m) were reshaped and consolidated, so that they assure the supply and the evacuation from/to lake/river Prut, subject to necessary water level of the lake.

Funding - From LIFE Nature Programme; Co-financing Ministry of Environment and County Council Galati,Regional Agency for Environmental Protection Galati (RAEP Galati)

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Pochina area during restoration
Pochina Lake after restoration
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Danube
River basin Prut Barlad

Subcatchment

River name Prut
Area category Less than 10 km²
Area (km2)
Maximum altitude category 100 - 200 m
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion Eastern Plains
Dominant land cover
Waterbody ID



Other case studies in this subcatchment: Ecological Restoration of Mata-Radeanu Complex, Ecological Restoration of Vlascuta Lake, The Ciobarciu Wetland Project


Site

Name Pochina Lake
WFD water body codes ROLW13.1_B5.2
WFD (national) typology ROLN01
WFD water body name
Pre-project morphology Side ponds
Reference morphology Single channel, Supply channel and discharge channel wich gravitational transfer a sufficient water volum to contribute to the conservation of this special area
Desired post project morphology
Heavily modified water body
National/international site designation EU - Special Protected Area
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate Silt, Sedimentary rocks (mixture of sand and mud of fluviatile origin).
River corridor land use Wetland
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2005/11/01
Works started 2006/05/01
Works completed 2006/06/01
Project completed
Total cost category 10 - 50 k€
Total cost (k€) 31 k€31,000 € <br />
Benefit to cost ratio
Funding sources Ministry of Environment and County Council Galati, Regional Agency for Environmental Protection Galati (RAEP Galati), EU LIFE Programme

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Less than 1 k€ 0.737 k€737 € <br /> Regional Agenty for Environmental Protection Galati (REPA Galati) Fica Boldea
Stakeholder engagement and communication Regional Agenty for Environmental Protection Galati (RAEP Galati) Fica Boldea
Works and works supervision Less than 1 k€ 0.368 k€368 € <br />
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Width & depth variation
Biology
Physico-chemical Oxygen balance
Other reasons for the project


Measures

Structural measures
Bank/bed modifications Morphological diversification, Channel reprofiling
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other Information provision


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative
Width & depth variation Improvement

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description
http://www.wise-rtd.info The web-site of Water Knowledge Portal
http://www.mmediu.ro Web-site of The Romanian Ministry of Environment and Forests