Case study:Ecological restoration of The Arboleda and the Meander of Santes Creus. Aiguamúrcia municipality (Alt Camp). Gaia River Basin

From RESTORE
Revision as of 09:15, 5 June 2017 by Alexrrc (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 41° 20' 43.45" N, 1° 21' 34.41" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Habitat and biodiversity, Hydromorphology
Country Spain
Main contact forename Marga
Main contact surname Manzano
Main contact user ID
Contact organisation ACA
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The morphological restoration project area is located in a Natura 2000 site, in the monastery of Santes Creus, a scenically and symbolic landmark. The whole project will pursue conservation objectives set forth by the Plan of Catalonia natural areas and enhancing the natural, scenic and social basis for the declaration of the Grove of Santes Creus as an Area of Natural Interest. The main actions in this project are: demolition and removal of the rubble to recover geomorphological processes characteristic of stretch and lateral and vertical connectivity of the same; geomorphological reconstruction of the section; Improvement and restoration of habitats; elimination of exotic plants, as Tradescantia fluminensis or Phytocala americana. The project has a total budget of 43.550.476 € and is financed by the ACA (Agencia Catalana del Agua) and Tarragona Provincial Government.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Aerial view of the area
Rip-rap
Erosion in the rip-rap area
Photos of the side rip-rap in the filter area, currently out of service
Photos of the side rip-rap in the filter area, currently out of service
Exotic vegetation colonizing the banks
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district Pirineo Oriental
River basin Gaia

Subcatchment

River name Gaia
Area category
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 314 m0.314 km <br />31,400 cm <br />
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover Extensive agriculture
Waterbody ID



Site

Name La Arboleda y Meandro de Santes Creus
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Sinuous
Reference morphology Sinuous
Desired post project morphology
Heavily modified water body
National/international site designation EU - Special Protected Area
Local/regional site designations Site of Community Importance
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2010/07/01
Works started
Works completed
Project completed
Total cost category 1000 - 5000 k€
Total cost (k€) 43550 k€43,550,000 € <br />
Benefit to cost ratio
Funding sources ACA, Tarragona Provincial Government

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design Consultores en Ciencies de la Conservació
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform, Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project Recreation, Community demand


Measures

Structural measures
Bank/bed modifications Removal of rip-rap, Bank stabilisation
Floodplain / River corridor Removal of exotic plants
Planform / Channel pattern
Other Removal of rubbish
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information