Case study:Route water: environmental restoration project for tourist use

From RESTORE
Revision as of 14:05, 1 June 2017 by Alexrrc (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 38° 1' 25.94" N, 4° 31' 50.64" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://adamuzturismosostenible.blogspot.com.es/2011/07/recuperacion-del-gollizno-en-la-ruta.html
Themes Habitat and biodiversity, Social benefits
Country Spain
Main contact forename ADAMUZ TURISMO SOSTENIBLE
Main contact surname ADAMUZ TURISMO SOSTENIBLE
Main contact user ID
Contact organisation ADAMUZ TURISMO SOSTENIBLE
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The restoration aims to undertake the recovery of the ecological integrity of the environment on which they act and the enhancement of cultural and heritage resources for tourism use, based on the inherent variability of the area channel, in terms of biodiversity and ecological processes and functions, in a historical context, which also takes into account sustainable traditional uses. The main purpose of this project is the comprehensive restoration of the area, which has to be clearly defined sub-sections of ecological restoration, and those in which, based on the characteristics of the area, the rehabilitation must be compatible area with a touristic use.

Works included removal of exotic plants (Eucalyptus).

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


Picture of El Gollizno, a local place
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district C.H.Guadalquivir
River basin Guadalquivir

Subcatchment

River name Arroyo del Concejo y Arroyo Tamujoso
Area category Less than 10 km²
Area (km2)
Maximum altitude category 200 - 500 m
Maximum altitude (m) 240 m0.24 km <br />24,000 cm <br />
Dominant geology Siliceous
Ecoregion Ibero-Macaronesian
Dominant land cover Extensive agriculture
Waterbody ID



Site

Name Molino del Gollizno
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Single channel
Reference morphology Single channel
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use Extensive agriculture
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 2010/01/01
Works started
Works completed
Project completed
Total cost category 100 - 500 k€
Total cost (k€) 240 k€240,000 € <br />
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform, Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project Recreation


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor Removal of exotic plants, Restoring riparian vegetation
Planform / Channel pattern Morphology of the bed altered
Other
Non-structural measures
Management interventions Recovery of the old mill
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information