Location: 65° 1' 18.97" N, 25° 29' 15.05" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Habitat and biodiversity, Hydropower
Country Finland
Main contact forename -
Main contact surname -
Main contact user ID
Contact organisation
Contact organisation web site
Partner organisations
Parent multi-site project

Case_study:Restoration of Oulujoki River

This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


Construction of the Merikoski fishway was the first step restoring the Oulujoki river for the migrating fish. Merkoski water power plant was the lowest obstacle for fish migration before the fishway was constructed in 2003 enabling migrating fish to rise up to the lower reaches of the river.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.

Catchment and subcatchment

Select a catchment/subcatchment


Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)

Catchment

River basin district -
River basin Oulujoki River basin

Subcatchment

River name Oulujoki River
Area category more than 10000 km²
Area (km2) 2284122,841 km² <br />2,284,100 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion Fenno-Scandian Shield
Dominant land cover
Waterbody ID



Site

Edit site
Name Merikoski torrent water power plant
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology Artificial channel
Reference morphology Artificial channel, Fishway
Desired post project morphology
Heavily modified water body Yes
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology Artificially regulated
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Edit project background
Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Edit reasons for restoration
Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Edit Measures
Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Edit Hydromorphological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Edit biological
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Edit Physico-chemical
quality elements
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Edit Other responses
Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents

Upload monitoring documents



Image gallery



Additional documents and videos

Upload additional documents


Additional links and references

Edit links and references
Link Description

Supplementary Information

Edit Supplementary Information