Case study:Austria/Slovenia cross-border section - Interreg IIIa Project "Maßnahmen Unteres Murtal" 2003-2008

From RESTORE
Revision as of 12:38, 1 July 2015 by Freiland (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 46° 43' 36.80" N, 15° 47' 58.14" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.unteresmurtal.steiermark.at/
Themes Environmental flows and water resources, Habitat and biodiversity, Hydromorphology, Spatial planning
Country Austria
Main contact forename Jörg
Main contact surname Raderbauer
Main contact user ID User:9984
Contact organisation freiland Environmental Consulting Civil Engineers Ltd.
Contact organisation web site http://www.freiland.at
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


In accordance with the division designated for the INTERREG IIIA Project, the Lower Mur Valley habitat encompasses the Austrian border segment of the Mur River between Spielfeld and Sicheldorf (the “Grenzmur”), which forms the border to Slovenia, as well as the alluvial and cultural landscape bordering it to the north, with a total area of approx. 137 km². In western and eastern direction the area extends from Spielfeld all the way to the Austrian-Slovenian state border near Bad Radkersburg. This region encompasses the “Styrian Grenzmur with the Gamlitzbach and Gnasbach streams” European nature reserve, as well as, in part, the “Parts of the South-East Styrian hill country, including Höll and Grabenland streams” European nature reserve. During the 5-year project (2003-2008), 220,000 m³ of bed load were added along a total stretch of 1,800 m in order to prevent any further depth erosion of the riverbed of the Mur. Furthermore 32 ha of dynamic Mur and alluvial habitat were created as well as a total of 45,000 m tributary streams were reactivated and/or extended. The total value of this four year project was 3.8 million €. 50% of the project was financed by the European Union (Interreg IIIa), whereas national contributions are distributed variably between project applicant and co-financers.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information