Case study:Environmental regeneration project in Magro river bed
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: none specified
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Spain |
Main contact forename | |
Main contact surname | |
Main contact user ID | |
Contact organisation | C.H.Júcar |
Contact organisation web site | |
Partner organisations | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | C.H.Júcar |
---|---|
River basin | Júcar |
Subcatchment
River name | Magro |
---|---|
Area category | |
Area (km2) | |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | Calcareous |
Ecoregion | Ibero-Macaronesian |
Dominant land cover | |
Waterbody ID |
Site
Name | Proyecto de restauración del río Magro desde Caudete de Las Fuentes hasta el Embalse de Forata |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | |
River corridor land use | |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | 0.910.91 m³/s <br />910 l/s <br /> |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | 72000 m72 km <br />7,200,000 cm <br /> |
---|---|
Project started | 2009/11/01 |
Works started | |
Works completed | |
Project completed | |
Total cost category | 1000 - 5000 k€ |
Total cost (k€) | 3879 k€3,879,000 € <br /> |
Benefit to cost ratio | |
Funding sources | MARM |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | Vielca Ingenieros S.A. | ||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | Pollution |
---|---|
Hydromorphology | |
Biology | |
Physico-chemical | Nutrient concentrations |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | Selective removal of organic muds and sludge contaminated with toxic |
Non-structural measures
| |
Management interventions | Cleaning channels |
Social measures (incl. engagement) | Conditioning roads, Conditioning access for people |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|