Case study:Environment-friendly Reduction of Flood Risk in the Multi-thread Reach of the Czarny Dunajec River
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: 49° 26' 9.82" N, 19° 51' 31.35" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | |
Themes | |
Country | Poland |
Main contact forename | poczta@krakow.rzgw.gov.pl |
Main contact surname | poczta@krakow.rzgw.gov.pl |
Main contact user ID | |
Contact organisation | Regional Water Management Board in Kraków |
Contact organisation web site | |
Partner organisations | |
Parent multi-site project | |
This is a parent project encompassing the following projects |
No |
This case study hasn’t got a picture, you can add one by editing the project overview.
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Northern foreland of the Tatra Mountains |
---|---|
River basin | the Vistula River basin |
Subcatchment
River name | The Czarny Dunajec River |
---|---|
Area category | 100 - 1000 km² |
Area (km2) | 160160 km² <br />16,000 ha <br /> |
Maximum altitude category | |
Maximum altitude (m) | |
Dominant geology | siliceous (granitsiliceous (granite, gneiss and quartzite) and calcareous (limestone and dolomite) in the high-mountain part of the basin, siliceous (sandstone and shale flysch) in the lower part |
Ecoregion | Carpathians |
Dominant land cover | forest 50%, extensive agriculture 30%, grassland 20% |
Waterbody ID |
Site
Name | |
---|---|
WFD water body codes | |
WFD (national) typology | |
WFD water body name | Czarny Dunajec River |
Pre-project morphology | |
Reference morphology | |
Desired post project morphology | |
Heavily modified water body | No |
National/international site designation | |
Local/regional site designations | |
Protected species present | No |
Invasive species present | No |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Cobble to pebble |
River corridor land use | |
Average bankfull channel width category | more than 50 m |
Average bankfull channel width (m) | 8080 m <br />0.08 km <br />8,000 cm <br /> |
Average bankfull channel depth category | 0.5 - 2 m |
Average bankfull channel depth (m) | 1.21.2 m <br />0.0012 km <br />120 cm <br /> |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 04/2011 |
Works started | |
Works completed | |
Project completed | 2011/12/01 |
Total cost category | 1 - 10 k€ |
Total cost (k€) | 99 k€ <br />9,000 € <br /> |
Benefit to cost ratio | |
Funding sources | funds of the Ministry of the Interior and Administration of Poland |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | |||||
Works and works supervision | |||||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | Flood risk management |
---|---|
Hydromorphology | Quantity & dynamics of flow, Structure & condition of riparian/lake shore zones |
Biology | |
Physico-chemical | |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | Opening inlets to side channels, directing the flow by deflectors made of gravel |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|
Supplementary Information
Edit Supplementary Information