Case study:Project Usk River Restoration (PURR) 2011-2012

From RESTORE
Revision as of 14:07, 15 September 2014 by Eldridge123 (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 51° 56' 56.21" N, 3° 23' 29.27" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site http://www.wyeuskfoundation.org/projects/purr.php
Themes Fisheries, Habitat and biodiversity, Land use management - agriculture, Water quality
Country Wales
Main contact forename Stephen
Main contact surname Marsh-Smith
Main contact user ID
Contact organisation Wye & Usk Foundation
Contact organisation web site http://www.wyeuskfoundation.org/
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


With the combined resources of Biffaward and the Brecon Beacons Trust, a project to work in the middle Usk started on 1st Jan 2011. Rather unusual geographic limits are attached to PURR: Biffaward is a landfill tax fund that allows activity within a radius of 10 miles of a landfill site, in this case near Felinfach, Brecon, while the geographic constraint of the Beacons Trust is the Park boundary itself. Thankfully they overlap quite conveniently and allow work from Sennybridge to Crickhowell and include the upper reaches of the Monnow tributary, the Honddu. The required landfill tax contribution was made with donations from Usk owners and anglers and the project was scheduled to last for two years.

So far we have completed habitat restoration on the following:


1.7km of the Menasgin at Llanfrynach

0.45km of the Rhiangoll, near Crickhowell

1.1km of the Upper Grwyne Fawr

1.2 km of the Monnow Honddu

The habitat team have also cut trees and pleaching in brash on the Caerfanell between Aber and the junction with the Usk.

We have also completed two fish passes on the Crawnon and two modifications to weirs on the Caerfanell are planned for summer 2012. Restoring salmon access to the Crawnon has been an ongoing project that started in 2006 and it was satisfying to see a large salmon redd in late December, 4 miles above British Waterways’ canal off-take weir. Over the next few years this high quality tributary will become an important salmon nursery area for the Usk.

Finally, this project has also continued with the work to eradicate Japanese knotweed from the middle reaches of the Usk.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information