Case study:Ecological Restoration of Vlascuta Lake
Jump to navigation
Jump to search
This case study is pending approval by a RiverWiki administrator.
Location: 74° 31' 12.00" N, 47° 59' 24.00" E
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.
Project overview
Status | Complete |
---|---|
Project web site | http://www.luncaprut.ro |
Themes | Habitat and biodiversity |
Country | Romania |
Main contact forename | Fica |
Main contact surname | Boldea |
Main contact user ID | |
Contact organisation | Prut - Barlad River Basin Authority |
Contact organisation web site | http://www.rowater.ro/daprut/default.aspx |
Partner organisations | University of Bucharest – Centre for Environmental Research and Impact Studies, University of Bucharest – Centre for Environmental Research and Impact Studies; Romania Romanian Ornithological Society; Galaţi Forestry District |
This is a parent project encompassing the following projects |
Ecological Restoration of Vlascuta Lake |
Project summary
This case study hasn’t got any project summary, you can add some by editing the project overview.
Monitoring surveys and results
This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.
Lessons learnt
This case study hasn’t got any lessons learnt, you can add some by editing the project overview.
Catchment and subcatchment
Select a catchment/subcatchment
Edit the catchment and subcatchment details
(affects all case studies in this subcatchment)
Catchment
River basin district | Danube |
---|---|
River basin | Prut Barlad |
Subcatchment
River name | Prut |
---|---|
Area category | Less than 10 km² |
Area (km2) | |
Maximum altitude category | 100 - 200 m |
Maximum altitude (m) | |
Dominant geology | Siliceous |
Ecoregion | Eastern Plains |
Dominant land cover | |
Waterbody ID |
Other case studies in this subcatchment: Ecological Restoration of Mata-Radeanu Complex, Ecological Restoration of Natural Lake Pochina, The Ciobarciu Wetland Project
Site
Name | Vlascuta Lake |
---|---|
WFD water body codes | ROLW13.1_B5.2 |
WFD (national) typology | ROLN01 |
WFD water body name | |
Pre-project morphology | Side ponds |
Reference morphology | Single channel, Supply channel and discharge channel |
Desired post project morphology | |
Heavily modified water body | |
National/international site designation | EU - Special Protected Area |
Local/regional site designations | |
Protected species present | |
Invasive species present | |
Species of interest | |
Dominant hydrology | |
Dominant substrate | Silt, Sedimentary rocks (mixture of sand and mud of fluviatile origin). |
River corridor land use | Wetland |
Average bankfull channel width category | |
Average bankfull channel width (m) | |
Average bankfull channel depth category | |
Average bankfull channel depth (m) | |
Mean discharge category | |
Mean annual discharge (m3/s) | |
Average channel gradient category | |
Average channel gradient | |
Average unit stream power (W/m2) |
Project background
Reach length directly affected (m) | |
---|---|
Project started | 2005/11/01 |
Works started | 2009/08/01 |
Works completed | 2009/11/01 |
Project completed | |
Total cost category | 50 - 100 k€ |
Total cost (k€) | 79 k€79,000 € <br /> |
Benefit to cost ratio | |
Funding sources | From LIFE Nature Programm; Co-financig Ministry of Environment and County Council Galati, Regional Agenty for Environmental Protection Galati (RAEP Galati) |
Cost for project phases
Phase | cost category | cost exact (k€) | Lead organisation | Contact forename | Contact surname |
---|---|---|---|---|---|
Investigation and design | |||||
Stakeholder engagement and communication | Regional Agenty for Environmental Protection Galati (RAEP Galati) | Fica | Boldea | ||
Works and works supervision | Less than 1 k€ | 0.664 k€664 € <br /> | |||
Post-project management and maintenance | |||||
Monitoring |
Reasons for river restoration
Mitigation of a pressure | |
---|---|
Hydromorphology | Width & depth variation |
Biology | |
Physico-chemical | Oxygen balance |
Other reasons for the project |
Measures
Structural measures
| |
---|---|
Bank/bed modifications | |
Floodplain / River corridor | |
Planform / Channel pattern | |
Other | The rehabilitation of the two channels, witch connect Pochina Lake and Prut River, respectively the water supply channel (362 m) and evacuation channel (235 m) and removal of mud from of about 2000 sqm surface of lake, the worst part of the lake. |
Non-structural measures
| |
Management interventions | |
Social measures (incl. engagement) | |
Other | Information provision |
Monitoring
Hydromorphological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative | |||
Width & depth variation | Improvement |
Biological quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Physico-chemical quality elements
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Any other monitoring, e.g. social, economic
Element | When monitored | Type of monitoring | Control site used | Result | ||
---|---|---|---|---|---|---|
Before measures | After measures | Qualitative | Quantitative |
Monitoring documents
Image gallery
Additional documents and videos
Additional links and references
Link | Description |
---|