Case study:Restoration for fishery in the river Hammonjoki

From RESTORE
Revision as of 13:02, 18 December 2013 by Kasvio (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 61° 3' 29.75" N, 25° 22' 1.05" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes Fisheries, Habitat and biodiversity
Country Finland
Main contact forename Ismo
Main contact surname Malin
Main contact user ID User:Kasvio
Contact organisation
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
Project picture

Project summary

Edit project overview to modify the project summary.


The river Hammonjoki was restored from seven different rapid sections by the end of year 2007. The source of the water in the river comes mainly from springs. Catchment area is 45 km2 and the river runs to the lake Vesijärvi. The river is highly appreciated among the fly fishers. The restoration plan was made in the Centre for Economic, Transport and the Environment of Uusimaa. Hämeen TE-Centre, The County of Hollola and the fishing ground of Lake Vesijärvi funded the project and there were plenty of volunteers working in the river during restoration work.

Previously the connectivity of the river was blocked by an old mill dam. The old dam is protected by the ‘National Board of Antiquities and Historical Monuments’ and it was not permitted to take it down totally, but it was possible to explode a hole into the dam to enable the fish migration. The bypass was constructed to the rapid section year 2007.

The river Hammonjoki inhabits populations of e.g. brown trout, brook trout, grayling and brook lamprey. It is the only river in the catchment area of Lake Vesijärvi where the trout can migrate to. The water quality is the best in the regoin because most of the water is produced through the springs. Brown trout is the only natural salmonid species of the river and is mainly found from the lower parts of the river. Brook trout is the most common species and abundant in the whole river, also in the small headwaters. Brook trout population originates from the fish farm upstream (Hatsina) stockings made in 1960´s. Recently there has also been seen stocking of rainbow trout for fisheries. The river Hammonjoki has had a distinct fishing section for fly fishing since 1990´s.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment



Site

Name
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information