Case study:The Upper Raba River Spawning Grounds

From RESTORE
Revision as of 17:54, 6 September 2013 by SFW Rob (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 49° 49' 47.88" N, 19° 57' 29.99" E
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status In progress
Project web site
Themes Habitat and biodiversity
Country Poland
Main contact forename The Upper Raba River Spawning Grounds Project
Main contact surname The Upper Raba River Spawning Grounds Project
Main contact user ID User:Arolam
Contact organisation
Contact organisation web site http://tarliskagornejraby.pl/news.php
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The Raba River is located in southern of Poland and is one of the tributaries of the River Vistula. The restoration was carried out as the aim of reinforcing the corridor boundaries without a disturbing the river channel. The objective of the restoration was to increase retention of flood water avoiding regulation and bank reinforcement, conserving the river habitats and their connectivity focusing on river subjectivity, its features and needs in objective to attain a quasi-natural state of the valley.

Steps and progress of the restoration (technical work)? Erodible corridor on the stem river; Decommissioning of check dams on two tributaries; Monitoring and maintenance of riffles as the features controlling channel conveyance

- Discovered good restoration practices (i.e. techniques, methods, practices)? Preparation of the guidelines ‘Possible technical and biological interventions in mountain river maintenance’ for river managers

Expected results: - Changes in hydromorphological, biological or physico-chemical elements of the watercourse after restoration? Increased habitat heterogeneity in the stem river and tributaries; Enhanced storage of bed material improving the spawning conditions for fish; Re-establishing the longitudinal connectivity of the tributaries; Reduced maximum summer temperatures of the river water; Improved condition of fish populations; Reduced occurrence of invasive alien plant species in the riparian area - Other results (awareness-raising, land purchase, payment for ecosystem services, etc.)? Raising the environmental awareness among river managers and local inhabitants; Arresting and reversal of the tendency to channel incision, in the long-term allowing to re-establish the conditions of geomorphic dynamic equilibrium; Increased retention of flood water in the river reach within the erodible corridor; Re-establishing the formation of early successional stages of riparian plant communities

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


The Upper Raba River Spawning Groundsn Erosion control
The Upper Raba River Spawning Groundsn landscape
ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district the Vistula River basin
River basin The Raba River

Subcatchment

River name The Raba River
Area category 100 - 1000 km²
Area (km2) 644644 km² <br />64,400 ha <br />
Maximum altitude category
Maximum altitude (m)
Dominant geology Siliceous
Ecoregion
Dominant land cover Woodland, Extensive agriculture
Waterbody ID



Site

Name The Raba River
WFD water body codes
WFD (national) typology
WFD water body name The Raba River
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body No
National/international site designation
Local/regional site designations
Protected species present No
Invasive species present No
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category more than 50 m
Average bankfull channel width (m) 6060 m <br />0.06 km <br />6,000 cm <br />
Average bankfull channel depth category 2 - 5 m
Average bankfull channel depth (m) 2.52.5 m <br />0.0025 km <br />250 cm <br />
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m)
Project started 01/2012
Works started
Works completed
Project completed 2016/12/01
Total cost category 500 - 1000 k€
Total cost (k€)
Benefit to cost ratio
Funding sources Swiss Contribution to the Enlarged European Union, Association own sources

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform
Biology
Physico-chemical
Other reasons for the project


Measures

Structural measures
Bank/bed modifications
Floodplain / River corridor
Planform / Channel pattern
Other
Non-structural measures
Management interventions
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information