Case study:Restoration project in Verde River

From RESTORE
Revision as of 11:04, 6 September 2013 by SFW Mehul (talk | contribs)
Jump to navigation Jump to search

This case study is pending approval by a RiverWiki administrator.

Approve case study

 

0.00
(0 votes)


To discuss or comment on this case study, please use the discussion page.


Location: 39° 9' 13.05" N, 0° 28' 45.40" W
Loading map...
Left click to look around in the map, and use the wheel of your mouse to zoom in and out.


Project overview

Edit project overview
Status Complete
Project web site
Themes
Country Spain
Main contact forename C.H.Júcar
Main contact surname C.H.Júcar
Main contact user ID
Contact organisation C.H.Júcar
Contact organisation web site
Partner organisations
Parent multi-site project
This is a parent project
encompassing the following
projects
No
This case study hasn’t got a picture, you can add one by editing the project overview.

Project summary

Edit project overview to modify the project summary.


The restoration project in Verde River comprises the whole of it, between his source in the springs of Benimodo-Massalavés (Valencia province) and its mouth in the river Júcar on its left bank, just before the confluence of the river Magro. The purpose of the restoration of the Rio Verde is the recovery of good ecological status, required for the WFD by 2015. Thus, the actions proposed are targets in the short and long term, all framed in ENRR and the WFD. The main project objectives are, in short term, conditioning of DPH to improve the functioning natural hydraulic channel; increase river mobility space; conservation of riparian ecosystems; maintenance and improvement of current vegetation conditions; control of exotic vegetation; increased diversity of plant cover; improving the mobility of fish fauna; landscaping adjustment and environmental restoration of degraded areas; adaptation and promotion of social use the river. Long term: Improve the river dynamics; enhancement of riparian forest development; improving the aquatic environment and associated land to allow regeneration and diversification of the fauna; promoting social use of the river more attractive and environmentally; promote integration of use policies and land management with the use and management of rivers, with sustainability criteria.

Monitoring surveys and results

This case study hasn’t got any Monitoring survey and results, you can add some by editing the project overview.

Lessons learnt

This case study hasn’t got any lessons learnt, you can add some by editing the project overview.


Image gallery


ShowHideAdditionalImage.png


Catchment and subcatchment

Catchment

River basin district C.H.Júcar
River basin Júcar

Subcatchment

River name Verde
Area category
Area (km2)
Maximum altitude category
Maximum altitude (m)
Dominant geology
Ecoregion Ibero-Macaronesian
Dominant land cover
Waterbody ID



Site

Name Restauración del río Verde en los municipios de Benimodo, Massalvés, Alberique y Alzira (Valencia)
WFD water body codes
WFD (national) typology
WFD water body name
Pre-project morphology
Reference morphology
Desired post project morphology
Heavily modified water body
National/international site designation
Local/regional site designations Site of Community Importance
Protected species present
Invasive species present
Species of interest
Dominant hydrology
Dominant substrate
River corridor land use
Average bankfull channel width category
Average bankfull channel width (m)
Average bankfull channel depth category
Average bankfull channel depth (m)
Mean discharge category
Mean annual discharge (m3/s)
Average channel gradient category
Average channel gradient
Average unit stream power (W/m2)


Project background

Reach length directly affected (m) 14000 m14 km <br />1,400,000 cm <br />
Project started 2008/01/01
Works started
Works completed
Project completed
Total cost category
Total cost (k€)
Benefit to cost ratio
Funding sources MARM

Cost for project phases

Phase cost category cost exact (k€) Lead organisation Contact forename Contact surname
Investigation and design
Stakeholder engagement and communication
Works and works supervision ARIN (Arquitectos/Ingenieros Consultores S.A.)
Post-project management and maintenance
Monitoring



Reasons for river restoration

Mitigation of a pressure
Hydromorphology Channel pattern/planform, Continuity for organisms, Continuity of sediment transport, Structure & condition of riparian zones
Biology
Physico-chemical
Other reasons for the project Recreation


Measures

Structural measures
Bank/bed modifications Recess side slopes, Barriers removal
Floodplain / River corridor Removal of exotic plants, Elimination of structural elements concreted
Planform / Channel pattern Removal of speckles
Other
Non-structural measures
Management interventions Improve forest management and agricultural
Social measures (incl. engagement)
Other


Monitoring

Hydromorphological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Biological quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Physico-chemical quality elements

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative

Any other monitoring, e.g. social, economic

Element When monitored Type of monitoring Control site used Result
Before measures After measures Qualitative Quantitative


Monitoring documents



Additional documents and videos


Additional links and references

Link Description

Supplementary Information

Edit Supplementary Information